







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Miami
Kitchen remodels in Miami run $16,520 to $53,100 for a full tear-out and rebuild, and the biggest factor in that range isn’t the tile you pick. It’s the wall you open. In ZIP codes like 33128 and 33130, kitchens inside 1920s Mediterranean Revival masonry homes often hide original cast-iron drain lines and ungrounded wiring, and any scope that opens a wall triggers a Miami-Dade product-approval and wind-mitigation review before a single cabinet gets hung. We know what that means for your timeline, your permit, and your budget, and we price it in writing before the demo starts. Call (833) 630-4214 to schedule your free estimate and design consult.
Why Groundwork Construction Co. of Westchester Is Miami’s Preferred Kitchen Remodeling Company

Our technicians have up to 12 years of experience, and every one of them is background-checked and arrives in uniform. Nothing gets subbed to a crew you’ve never met.
Miami rewards a contractor who reads the permit counter correctly. This county runs the High Velocity Hurricane Zone, the strictest wind-borne debris and product-approval code in the U.S., so every component that touches the building envelope needs a Miami-Dade NOA approval. We build our scopes around that from day one instead of discovering it at inspection. Our Kitchen Remodeling team writes line-item quotes, pulls the permits, and passes inspections before the cabinets go in.
Calls get answered by a live person 24/7. No voicemail, no waiting until Monday. Every project is covered by our 730-Day Done Right Promise – if it isn’t done right, we make it right – one of the longest workmanship guarantees in residential construction. If you’re in Miami and you’ve been burned before by a vague bid or a crew that disappeared, that promise is the whole point. And with $1,000 off projects over $10,000 plus 0% financing for 18 months, the number that shows up on the quote is the number you pay.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Kitchen Remodeling Services in Miami
We handle the full scope, from foundation to finish line. Here’s where Miami kitchens usually start.
Full Kitchen Remodeling
A full remodel in a Miami home means new layout, new plumbing rough-in where the cast iron has failed, new electrical, cabinets, counters, and flooring. We sequence the Miami-Dade inspection sign-off into the draw schedule so the job doesn’t stall waiting on a review. Typical full remodels here run $16,520 to $53,100.
Cabinets & Countertops
Cabinet installation in Miami runs $4,720 to $15,340, and quartz or granite countertops add $2,360 to $7,670. We spec stainless or hot-dip galvanized hardware on every box and drawer slide, because standard steel rusts at the hinge points within a few humid seasons in coastal ZIPs like 33139. That one upgrade is the difference between a kitchen that lasts and one you’re re-facing in year six.
Kitchen Design & Layout
Layout work in older CBS block homes has to account for where the original drain stack sits and whether the wall has continuous reinforcement. We design around what’s actually in the wall, not what a plan says should be there. A kitchen island, if the footprint allows one, runs $3,540 to $11,800 installed.
Backsplash, Tile & Flooring
Backsplash installation runs $945 to $2,950, and we seal every countertop and backsplash joint with marine-grade sealant rather than standard caulk. Salt air and year-round humidity work through cheap seams, and mold grows behind the tile before you can see it. The sealant line item is small. The mold remediation isn’t.
Trusted Brands We Service in Miami
We work with a curated set of top-tier partners: KraftMaid and Cambria in the kitchen, Kohler for fixtures, GAF and CertainTeed on anything roofing-adjacent, and Tremron and Techo-Bloc for outdoor hardscape that ties into a kitchen addition. We don’t stock parts locally and we don’t run a warehouse. Materials get ordered to your project, and because the brands are vetted, the turnaround is predictable rather than hopeful. What you get is quality, not just whatever the supply house had on hand.
Common Kitchen Remodeling Problems We See in Miami Homes
- Rusted hinges and slides within a few seasons. Cabinet boxes spec’d in standard steel rather than stainless or hot-dip galvanized hardware corrode at the hinge and slide points fast in coastal ZIPs like 33139. Salt-laden air plus year-round humidity does the work quietly, and by year five the doors don’t sit square.
- Mold behind the tile. Backsplash and countertop joints sealed with standard caulk instead of marine-grade sealant grow mold as salt air and humidity push through the seam. You smell it before you see it.
- Walls that open into a wind-mitigation job. In 1920s CBS homes a remodel that opens a wall often reveals no continuous reinforcement or tie-downs, which forces a full retrofit and NOA-approved products before the permit can close. We find this in Little Havana and Edgewater regularly, and we scope it honestly up front.
- Corroded cast iron under the sink. A typical Miami kitchen remodel starts with a homeowner in a 1960s concrete-block apartment who wants new cabinets and quartz counters. Pull the first cabinet and the original cast-iron drain under the sink is often corroded from decades of humid, salt-laden air. A qualified local contractor then opens a scope that includes rough-in upgrades, permits for the plumbing change, and a draw schedule that accounts for Miami-Dade inspection sign-off before the new cabinets go in.
Pricing for Kitchen Remodeling in Miami, FL

Upfront pricing, no surprises. Here’s what Miami kitchens actually run, line by line:
| Work | Typical Miami Range |
|---|---|
| Full Kitchen Remodel | $16,520 – $53,100 |
| Small Kitchen Remodel | $10,620 – $23,600 |
| Cabinet Installation | $4,720 – $15,340 |
| Countertop Installation | $2,360 – $7,670 |
| Backsplash Installation | $945 – $2,950 |
| Kitchen Island Installation | $3,540 – $11,800 |
What moves you up the range: opening a wall and finding a plumbing or wind-mitigation surprise, moving the drain stack, upgrading to marine-grade hardware throughout, and whether the job needs a full Miami-Dade NOA product review. The free estimate and design consult gives you a written line-item quote and a realistic timeline. With $1,000 off projects over $10,000 and 0% financing for 18 months, the top of the range is genuinely reachable. Estimates are free. Call (833) 630-4214.
See the difference
Before
After
Before
After
Before
AfterWe Also Serve Cities Near Miami
We cover the neighborhoods and towns around the city, including Brownsville, Gladeview, Miami Springs, and Coral Gables. Salt air and the county’s wind code reach inland too, so the material standards stay the same. If you’re just outside the Miami line and want to know whether your address is covered, call and ask – we’ll tell you straight.
Serving Miami, FL – Our Local Coverage Area
We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Kitchen Remodeling in Miami

Only when the cabinets are part of an exterior or structural assembly that falls under the High Velocity Hurricane Zone rules – standard interior cabinetry on an unchanged wall doesn’t require it. If your remodel opens an exterior wall or touches framing, the products involved need Miami-Dade NOA approval, and that includes anything that becomes part of the building envelope. We sort out which items need approval during the estimate so nothing surprises you at inspection. Call (833) 630-4214 for an exact answer on your address.
Salt-laden coastal air plus year-round humidity corrodes standard steel hardware at the hinge and slide points within a few humid seasons, especially in coastal ZIPs like 33139. The fix is straightforward: stainless or hot-dip galvanized hardware on every box, drawer slide, and hinge. It adds to the line item upfront and it’s the difference between ten years of smooth closing and re-facing the kitchen in year six. Ask us to quote the hardware spec explicitly. Estimates are free.
A line-item scope, a fixed price with no change-order language hiding the surprises, the permit-pulling responsibility named clearly, a draw schedule that ties payments to Miami-Dade inspection sign-off, and the workmanship warranty written in plain terms. Ours runs the 730-Day Done Right Promise – if it isn’t done right, we make it right. Get all of that in writing before anyone picks up a hammer. Call (833) 630-4214 to review a sample contract and get your free quote.
The coastal-spec version typically runs 8 to 15 percent higher upfront than the inland-spec because of stainless hardware, marine-grade sealants, and NOA-approved components. The math flips within a decade. Inland-spec kitchens see rusted slides by year five, mold behind the tile by year four, and a re-face before year eight – costs that erase the initial savings and then some. We quote both so you can see the comparison. Estimates are free.
Sometimes, and it depends entirely on what’s behind the wall. Many 1960s CBS apartments have continuous reinforcement and tie-downs already in place, and the retrofit isn’t triggered. Others don’t, and opening the wall reveals a bigger scope. We don’t know until we inspect, so we price the base remodel and flag the retrofit contingency in writing. That’s the honest way to do it. Call (833) 630-4214 to schedule the inspection and free estimate.
The Coastal Spec vs. the Inland Spec – and Why the Cheap Version Costs More
Here’s the failure we see most in Miami. A homeowner near the coast gets two bids on a kitchen, picks the lower one, and the contractor specs standard steel hardware and standard caulk because that’s what an inland bid would use. Two or three humid seasons later, the hinges are rusted at the pivot, the drawer slides grind, and there’s a dark line behind the backsplash where the caulk failed. The salt air and year-round humidity did the work, and it did it quietly.
We build the coastal spec into every Miami quote: stainless or hot-dip galvanized hardware on every cabinet box, marine-grade sealant at every countertop and backsplash joint, and moisture detailing that accounts for the June-to-November storm cycle. It adds 8 to 15 percent to the upfront price. It also adds years to the kitchen’s life, which is the whole point of the 730-Day Done Right Promise – built to last, backed in writing.
Bathrooms get a similar treatment if you’re remodeling both at once. A full bathroom remodel in Miami runs $10,620 to $33,040, and a walk-in shower installation runs $5,310 to $14,160. Both are subject to the same material rules. We quote them together so the plumbing rough-in work happens once, not twice.
Ready to Price Your Miami Kitchen?
Whether you’re in a Mediterranean Revival near Little Havana with original cast iron in the walls, or a concrete-block apartment in 33130 that needs new cabinets and quartz, the first step is the same: a free estimate and design consult. You’ll get a written line-item quote, a realistic timeline that accounts for Miami-Dade inspections, and a fixed price with no change orders hidden in the language. With $1,000 off projects over $10,000 and 0% financing for 18 months, the full coastal spec is within reach for most Miami homeowners. Call (833) 630-4214 to schedule your free estimate. A live person answers 24/7.
Written by the team at Groundwork Construction Co.












