What a New Detached ADU in Westchester, FL Actually Involves
A new detached ADU in Westchester, FL is a separate, self-contained living unit built on your lot, and most run $45,000 – $130,000 depending on size, utilities, and finish level. Plan on 6 – 10 months from permit application to final inspection, since Miami-Dade County review and HVHZ product approval set the pace. Call (833) 630-4214 and we’ll walk your lot and give you a written, line-item estimate for your New Detached ADU before you commit to anything.
The five stages of a New Detached ADU, and what you decide at each

Stage 1: Site walk and feasibility (week 1). We look at setbacks, the location of your septic or sewer lateral, your electrical service capacity, and how a second structure will drain on a lot that already sheds water during Miami-Dade’s summer storms. You decide the footprint and roughly where the unit sits. That placement decision drives everything else, so it comes first.
Stage 2: Design and county permitting (weeks 2 – 14). Because Westchester is unincorporated Miami-Dade, there’s no city hall to sign off; the whole package goes through the county’s e-permitting system, and every window, door, and roofing product needs a Miami-Dade NOA number before it’s approved. This is the longest stretch and the one that stalls most projects. You decide the floor plan and exterior finish at the start of this stage, because once plans are submitted, changes mean a resubmittal and lost weeks.
Stage 3: Site prep and foundation (weeks 15 – 18). Layout, excavation, and a monolithic slab or stem-wall foundation, with anchoring detailed for the hurricane zone. You don’t have much to decide here beyond confirming the final location stake-out.
Stage 4: Framing, roof, and dry-in (weeks 19 – 26). Concrete block walls and roof trusses go up, then sheathing, underlayment, and flashing. We schedule inspections at the frame and dry-in points. This is when you pick your roof type and impact glazing if you haven’t already.
Stage 5: Rough-in, finishes, and final (weeks 27 – 38). Plumbing, electrical, HVAC rough-in and inspection, then insulation, drywall, cabinets, fixtures, and trim. You decide finish grades at Stage 2 but finalize fixture selections here. The county’s final inspection closes the permit, and that’s when the unit is legally occupiable.
We keep upfront pricing with no surprises and answer calls with a live person, 24/7, so when an inspector flags something mid-build you hear it from us the same day. Every job carries our 730-Day Done Right Promise; if it’s not done right, we make it right. This is part of a full Home Additions & ADU in Westchester scope of work, so if your plan grows into a larger addition, we handle both under one contract.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that shape your New Detached ADU
- Block vs. wood frame: Concrete block is the Westchester default and matches the surrounding 1960s – 80s homes. It’s more expensive up front but handles wind and moisture far better than wood frame in this climate. Wood frame is quicker and cheaper but needs more weather detailing.
- Impact glazing vs. shutters: Impact windows and doors carry a Miami-Dade NOA and eliminate the last-minute shutter scramble, though they add meaningful cost. Accordion shutters cost less but you’ll deploy them every storm.
- Roof type: A flat or low-slope roof with a membrane matches the main house and drains well if detailed right. A hip roof in shingle or tile costs more but sheds heavy rain faster.
- Utilities: A new meter and separate service is cleanest and lets you rent or house family legally. Tapping off the main panel is cheaper but often won’t pass load calculations.
- Finishes: Builder-grade cabinet fronts and vinyl flooring keep you near the low end; solid-surface counters and tile floors push toward the high end. Impact-rated exterior doors are non-negotiable in the HVHZ.
We work with brands like Tremron and Techo-Bloc for the walkways and patio that usually go with an ADU, and we’ll spec the same quality into the unit itself. Homeowners often pair this with Paver Driveways in Westchester to give the new unit its own parking surface.
What a New Detached ADU costs in Westchester, FL

Detached ADUs in Westchester run $45,000 – $130,000, with $90,000 – $130,000 being the realistic range for a fully permitted, separately metered unit with full kitchen and bath. Here’s what moves the number:
- Size: A 400 sq ft studio sits at the bottom; a 700 – 800 sq ft one-bedroom pushes the top.
- Utility runs: A new meter, trenching to the sewer lateral, and upgraded electrical service add the most of any factor.
- Site condition: Infill lots with tight setbacks, mature trees, or drainage issues cost more to prep.
- HVHZ compliance: Impact glazing, strap nailers, and engineered roof-to-wall connections are required, not optional, and they add cost.
- Finish grade: Cabinets, counters, and flooring swing the price by tens of thousands.
A written estimate itemizes site work, foundation, framing, roof, MEP rough-in and finish, permits, and inspections. What it won’t cover: county impact fees, which vary, and any utility connection fees charged by the provider. You get the number you see is the number you pay. Upfront pricing, no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat Westchester’s unincorporated status does to a New Detached ADU
The single biggest thing to know about building here: there’s no city building department to call. Every Westchester ADU runs through Miami-Dade County permits and inspections, often via the county’s online e-permitting portal, and code enforcement is a county matter too. That means submissions need complete HVHZ documentation from the start, and a missing NOA on a window or door can hold up your review for weeks. Meanwhile, infill is changing the neighborhood block by block, with older 1970s – 80s concrete-block ranches and Spanish-style homes being expanded or replaced by larger two-story houses. On those lots, we’re often upgrading the main home’s electrical service to carry the ADU, since original panels are frequently maxed out. Wind-driven summer rain also punishes any weak flashing or drainage detail, so the waterproofing on the new unit’s roof and walls gets the same attention as the main house. We cover this work throughout Westchester and the surrounding area.
Serving Westchester, FL – Our Local Coverage Area
We serve Westchester and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked about a New Detached ADU in Westchester

Six to ten months from permit application to final inspection, with the county review and HVHZ approval consuming the longest stretch. Construction itself runs four to six months depending on size and weather. Call (833) 630-4214 for a realistic timeline for your specific lot.
Yes. Every new detached ADU in unincorporated Miami-Dade requires a county building permit, plan review, and inspections, and all glazing and roofing products must carry Miami-Dade NOA approval. There’s no city-level sign-off here, so the county is the authority. Call (833) 630-4214 and we’ll walk you through the submittal package.
Yes, and that’s the cleanest approach. We run new utilities to the unit with its own meter and separate service, which keeps the ADU self-contained and avoids load problems on an older main panel. Call (833) 630-4214 for an exact quote – estimates are free.
Between $45,000 and $130,000, with the $90,000 – $130,000 range covering a fully permitted, metered, finished unit. Size, utility runs, site condition, and finish grade drive the spread. Call (833) 630-4214 for a written, line-item estimate on your lot.
Every new detached ADU is backed by our 730-Day Done Right Promise; if it’s not done right, we make it right. Our technicians have up to 12 years of experience on projects like this. Call (833) 630-4214 for details.
Ready to price your New Detached ADU in Westchester?
We’ll come to your lot, check setbacks and utilities, and hand you a written line-item estimate for a new detached ADU in Westchester, free of charge. On the call we’ll confirm your address, ask what you want the unit for, and schedule the on-site visit. Reach us at (833) 630-4214. Our technicians have up to 12 years of experience, and we answer every call with a live person, 24/7. This is our Home Additions & ADU service, and homeowners often pair the work with Concrete Driveways & Concrete Work in Westchester for a finished approach to the new unit.