A Groundwork company - serving Westchester, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Miami, FL

ADU Site Prep & Utilities in Miami - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Westchester
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Miami, FL: What the Job Actually Involves

Site prep and utilities for an accessory dwelling unit in Miami typically runs $53,100 to $153,400 and takes six to twelve weeks from first stake in the ground to passed inspections – and it happens before a single wall goes up. This is the groundwork phase: clearing and grading the lot, running water, sewer, power and gas to the future structure, setting the slab or pier foundation, and getting every one of those stages inspected. Call (833) 630-4214 and we’ll walk your lot and give you a written line-item estimate, no charge.

Call (833) 630-4214

How We Run Site Prep & Utilities for a Miami ADU, Stage by Stage

A garage converted into a guest room and home office

No two lots here behave the same, but the sequence is consistent. Here’s what actually happens and when you’ll be asked to make a decision.

Stage 1: Site walk and utility locate (days 1 – 3)

We pull the property’s utility records, mark the existing water, sewer and electric runs, and confirm setbacks against your survey. On a typical Miami lot in the 33173 or 33112 ZIP, this is also where we find out whether the old septic or a shallow drain field is still in play. You decide here whether the ADU ties into the main house’s service or gets its own meters – a call that affects cost and future utility bills.

Stage 2: Clearing, grading and erosion control (days 3 – 10)

We remove sod, trees and old hardscape, then grade to drain away from the future slab. Because Miami sits low and flat, positive drainage and a silt fence aren’t optional – inspectors look for both. This is where homeowners often pair the ADU pad with new hardscape, and it’s the natural moment to talk about Concrete Driveways & Concrete Work in Miami or Paver Driveways in Miami so the site work and the access path get built together instead of twice.

Stage 3: Underground rough-in (days 10 – 30)

Sewer, water, electrical conduit and gas lines go in the ground and get inspected before anything covers them. We trench, set the lines to grade, and pressure-test. This is the stage most likely to surprise you: if the main house has aging cast-iron or gray poly plumbing, the tie-in may require replacement back to the city connection. You decide on pipe material here – PVC versus cast iron for the drain, copper versus PEX for supply.

Stage 4: Foundation and slab (days 30 – 55)

For a CBS block ADU we form and pour a reinforced slab or stem-wall foundation, with anchor bolts and hold-downs set for wind uplift. Concrete cures, then we move on. You may not think about this stage, but it’s the one that decides how the finished ADU performs in a storm.

Stage 5: Utility rough-in above grade and final inspections (days 55 – 80)

Stub-outs for fixtures, the electrical panel, and the meter connections get set and inspected. We schedule the county inspections, walk them with you, and hand off a site that’s ready for framing. If your project is part of a full Home Additions & ADU in Miami, this is the handoff point where the vertical build takes over.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make on This Job, and What Each One Costs You

  • Slab versus pier-and-beam foundation. A poured reinforced slab is the standard here and the cheaper path. Pier-and-beam costs more up front but lets you get under the floor later for plumbing. On Miami’s high water table, slab is usually the right call.
  • Sewer tie-in versus a new grinder pump. If the ADU sits below the main sewer invert – common on flat lots – you’ll need a lift station. Factor roughly a third more on the plumbing line for that.
  • PVC vs. cast-iron drain lines. PVC is cheaper and easier to work; cast iron is quieter. For an ADU, PVC wins on cost almost every time.
  • PEX vs. copper supply. PEX resists the corrosion that eats copper in coastal salt air. We lean PEX here, and so do most Miami builders now.
  • Separate utility meters or tie-ins to the main house. Separate meters cost more to set but make the ADU rentable without shared billing headaches.
  • Electrical service size. A 100-amp subpanel is fine for a studio; a 200-amp service fits a full one-bedroom with its own HVAC. Decide before the trench closes.

Every one of these is a line item in the written estimate. Upfront pricing, no surprises – the number you see is the number you pay, and we hold it.

What Does ADU Site Prep & Utilities Cost in Miami, FL?

A framer checking new wall framing on a home addition

Expect $53,100 to $153,400 for the full prep-and-utilities phase on a Miami ADU. Where your job lands depends on five variables:

  • Lot size and grade. A flat quarter-acre is fast. A lot that needs fill and re-grading in a low neighborhood pushes toward the top of the range.
  • Distance to existing utilities. A 20-foot run to the main house is a different job than a 120-foot run to the street connection with a lift station in the middle.
  • Age and condition of the existing plumbing and service. On older CBS homes, replacing cast-iron or galvanized lines back to the city tap adds real cost.
  • Foundation type and wind-uplift detailing. Miami-Dade code calls for specific hold-downs and anchoring that inland floors don’t.
  • Permit scope and inspection count. More separate permits mean more inspection passes, and each one is a scheduled cost.

What’s included: clearing, grading, trenching, utility rough-in, foundation, and passing the inspections. What typically isn’t: the finished ADU build itself, landscaping, and any utility-company connection fees. We itemize every one of those in the estimate so nothing shows up later. Call (833) 630-4214 for an exact quote – estimates are free.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Homes Specifically Do to This Job

Miami-Dade sits inside the High Velocity Hurricane Zone, and that changes site prep in ways that surprise out-of-state builders. Every roof, window and shutter product needs a Miami-Dade Notice of Acceptance, and the foundation and anchoring get inspected against wind-uplift requirements that don’t exist anywhere else in Florida. On top of that, salt-laden coastal air and a June-to-November hurricane season mean we spec corrosion-resistant fasteners, stainless hardware and moisture detail that keeps mold out. In older neighborhoods like Little Havana and Edgewater, we routinely find original 1920s CBS block walls with no continuous reinforcement or tie-downs, which triggers a full wind-mitigation retrofit and product approvals the moment a roof gets re-permitted. The work here also runs through a heavily permit-driven, bilingual construction culture, so plan on inspected stages and paperwork. If you’re near Brownsville or Gladeview, the same rules apply. That’s why this Miami work is a different trade from building in Orlando or Tampa. For the wider project, see our Home Additions & ADU service and the Miami service area.

Serving Miami, FL – Our Local Coverage Area

We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Site Prep & Utilities in Miami

A new wood side gate with black hardware

Get a Free On-Site Estimate for Your Miami ADU Site Prep

Call (833) 630-4214 for a free estimate on ADU Site Prep & Utilities in Miami. A live person answers around the clock, and we’ll set an on-site walk of your lot, talk utility routing, and hand you a written line-item quote with the permits and inspections spelled out. No voicemail, no vague bids – just the number, the scope, and a schedule.

Written by the team at Groundwork Construction Co.

Why Miami Chooses Groundwork Construction Co. of Westchester

We set the standard for ADU site prep & utilities in Miami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Customers Say

Trusted by homeowners across Miami and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gate

More services in Miami

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Westchester

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Westchester team

A local vetted partner works across Westchester and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Miami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami.

(833) 630-4214

Request a Free Estimate in Miami

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch