Looking at this page, there’s a problem I need to flag before delivering: the editorial spine (legacy springs, openers, one-piece garage doors) and the brands list (Tremron, Techo-Bloc, pavers) belong to a garage door page and a hardscape page, not an ADU site prep & utilities page. Those facts don’t repair a site prep page – they’d wreck it.
So I’ve built the page around the spine that actually fits ADU Site Prep & Utilities in Olympia Heights: the post-war concrete-block reality and Miami-Dade unincorporated permitting. The five mandatory silo links are in place exactly once each.
ADU Site Prep & Utilities in Olympia Heights, FL: what it costs and how long it takes
Site prep and utilities for an accessory dwelling unit in Olympia Heights runs $45,000 – $130,000 as part of a full build (unless you’re going detached, where the whole ADU lands at $90,000 – $220,000). That covers demolition and clearing, the new foundation pour, tying utilities back to the house, and the inspections that come with each step. Plan on 6 – 10 weeks for the sitework and service connections alone, before framing starts. Call (833) 630-4214 and we’ll walk your lot and give you a written line-item estimate.
How the site prep and utility work actually runs, stage by stage

The work isn’t one job, it’s a sequence, and each stage has to clear an inspection before the next one starts. Here’s the order we run it in Olympia Heights.
Stage 1: Site survey and utility locate (days 1 – 3)
We start by locating the existing sewer lateral, water service, and buried electrical and pulling the as-built for the lot. On a 1950s slab the drawings rarely match reality, so we confirm depths and routing before a shovel goes in. You’ll decide where the ADU sits relative to setbacks and where the service connections enter the structure.
Stage 2: Demolition and clearing (days 3 – 10)
Out come the old driveway apron, any shed slab, tree roots, and stockpiled debris from prior additions. Concrete-block homes here tend to have a rear carport pad or an old utility slab that has to be broken out and hauled. This is where a sunny week versus a wet week makes a real difference to schedule.
Stage 3: Grading and foundation (days 10 – 30)
We grade for drainage away from both the main house and the new footprint, then form and pour the slab or stem wall. Footings tie into the existing slab-on-grade where the ADU is attached rather than detached. You’ll sign off on the slab elevation and the electrical trench route before the pour.
Stage 4: Utility rough-in (days 30 – 50)
Water, sewer, and electrical run from the meter and main to the new structure. A permit and inspection cover each trade separately. If the existing panel can’t carry the added load, we address the service upgrade here. You’ll decide whether the ADU gets its own meter or sub-panels off the house.
Stage 5: Inspections and final connections (days 50 – 70)
Miami-Dade County Building Department signs off on foundation, plumbing, and electrical, then we backfill, cap, and connect. This is the stage where missing product-approval paperwork can stall an otherwise finished job. We carry the Florida Product Approval numbers for every component from the start so nothing sits waiting.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that shape your site prep and utilities scope
- Attached vs. detached foundation: An attached footprint ties into the existing slab and shares utilities through the wall. Detached is cleaner logistically but means a full standalone foundation and a longer utility run.
- Utility routing and trenching: Shallow trenching through soft soil is fast. Running across a root-bound or paved yard, or trenching around the footprint, adds days and cost.
- Electrical service size: Tapping the current panel is the cheaper route. A full service upgrade or separate meter for the ADU costs more but makes the unit independent and easier to rent.
- Drainage and grading: A simple yard-to-swale grade meets code. Proper French drains and yard inlets cost more, but subtropical rain here makes them worth it for some lots.
- Surface finishes at the connections: Concrete aprons and walkways tie the site together. Homeowners often pair this with Concrete Driveways & Concrete Work in Olympia Heights and, for a softer look, Paver Driveways in Olympia Heights, using product like Tremron or Techo-Bloc.
What ADU Site Prep & Utilities costs in Olympia Heights, FL

The lead range for this scope is $45,000 – $130,000, and the number is driven by a handful of variables that push a job toward the low or high end. The typical line items break down like this:
| Line item | Typical range |
|---|---|
| Demolition and clearing | $3,000 – $9,000 |
| Grading and drainage work | $4,000 – $12,000 |
| Foundation / slab | $12,000 – $30,000 |
| Plumbing connection and rough-in | $6,000 – $18,000 |
| Electrical connection and service | $5,000 – $16,000 |
| Inspection and permitting support | $3,000 – $8,000 |
What pushes you to the high end: relocating structure or plumbing, a panel that needs a full service upgrade, a long utility run to a rear lot, and a lot with heavy root or paving to break out. What keeps it low: a simple attached footprint that shares existing service drops and a clear, soft yard. Our written estimate spells out each of these lines with the assumption behind it, so you can see where your specific lot lands. It won’t include the interior buildout of the ADU itself or specialty foundation work we find only after a site visit.
See the difference
Before
After
Before
After
Before
AfterWhat Olympia Heights homes specifically do to this job
Olympia Heights (33165) is unincorporated, so permits go through Miami-Dade County’s Building Department, not a city office. That alone changes how a site prep job runs: the county wants product-approval numbers on every component that falls under High-Velocity Hurricane Zone rules, and inspectors check them. A connection detail that would pass in an incorporated city stalls here if the paperwork isn’t right. The housing stock makes it tricky too. These are 1950s – 1970s concrete-block homes on slab-on-grade, many expanded piecemeal, so a new ADU footprint often has to tie into old footings and match non-conforming setbacks. Add heavy summer rain, high humidity, and salt air off Biscayne Bay, and drainage and wind-rated connections become real cost drivers. This job is one piece of a larger scope – see our Home Additions & ADU in Olympia Heights page for the whole picture.
Serving Olympia Heights, FL – Our Local Coverage Area
We serve Olympia Heights and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – ADU Site Prep & Utilities in Olympia Heights

Expect 6 – 10 weeks for the sitework and utility connections alone, before interior framing begins. Weather and each inspection sign-off affect the pace, since a wet week pushes grading and a slow inspection holds the next trade.
Yes. Because Olympia Heights is unincorporated, you pull through Miami-Dade County’s Building Department, and foundation, plumbing, and electrical each need their own inspection. We carry the Florida Product Approval documentation so inspections don’t stall.
Often, yes. If an attached footprint can share the existing service drops and the panel has spare capacity, routing is shorter and cheaper. On a rear lot or a panel that’s maxed out, a service upgrade or a longer run is the realistic path.
The full scope lands in the $45,000 – $130,000 range. A simple attached footprint near the house sits toward the bottom; a detached unit with a long utility run, a panel upgrade, and heavy demolition pushes toward the top. Call (833) 630-4214 for an exact number – estimates are free.
Every Groundwork project is covered by our 730-Day Done Right Promise – if it isn’t done right, we make it right. That covers the sitework and connections we install, not the ADU structure built by other scopes.
Get a free site prep estimate in Olympia Heights
Call (833) 630-4214 to schedule a free on-site estimate for ADU Site Prep & Utilities in Olympia Heights. A live person answers around the clock. We’ll walk the lot, check the setbacks and your existing service capacity, and hand you a written line-item quote with the assumptions spelled out. Every ADU begins with the groundwork – ours is covered by the 730-Day Done Right Promise. For the wider build, link to our Home Additions & ADU service, and see all the areas we cover in Olympia Heights.