Garage Conversion ADU in Westchester, FL: What It Takes and What It Costs
A garage conversion ADU in Westchester, FL typically runs $45,000 to $130,000 and takes 3 to 5 months from permit submission to final inspection. You’re turning an existing concrete-block garage into a legal, separate living unit with its own kitchen, bathroom, sleeping area and entry – so it’s a full interior build inside a shell that already exists. Call (833) 630-4214 for a free on-site estimate and we’ll walk your garage together.
How a Garage Conversion ADU Comes Together, Stage by Stage

A conversion is faster and cheaper than a detached build because the foundation, walls and roof are already standing. The work is everything inside and underneath them. Here’s the real sequence we run in Westchester.
- Day 1-3, assessment and design: We measure the slab, check whether the existing garage floor sits at grade or below it, confirm ceiling height, and trace where the water heater, electrical panel and laundry connections sit. You decide the layout at this stage: studio or one-bedroom, kitchen against which wall, bathroom on the plumbing wall or across the room. Layout drives cost more than finishes do.
- Weeks 1-4, permitting: Because Westchester is unincorporated Miami-Dade, the permit goes through the county, usually via e-permitting, not a city hall. Plans need to show the new unit’s egress windows, separation from the main house, and how the existing structure meets HVHZ requirements. This is the slowest stretch and the one we can’t compress.
- Weeks 4-7, demolition and rough-in: Out comes the garage door (replaced with a framed wall and a real entry door), any old shelving, and the slab gets evaluated. Then plumbing, electrical and HVAC rough-in go in. The biggest single decision lands here: whether the bathroom and kitchen sit close to existing supply and drain lines, or whether we cut new ones through the slab.
- Weeks 7-12, insulation, drywall and finishes: Closed-cell spray foam goes up first in Miami-Dade because it handles the humidity and helps the unit hold its own against the afternoon heat. Then drywall, cabinetry, tile, flooring and paint. You pick finishes in week four so nothing waits on a delivery.
- Weeks 12-16, inspections and punch list: County inspectors sign off on framing, electrical, plumbing, mechanical and final. We handle the inspection scheduling. Then a walkthrough with you, a punch list, and the keys.
Our technicians have up to 12 years of experience on this kind of work, and every job is covered by our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Shape Your Westchester Garage Conversion ADU
Most of the budget isn’t in the finishes you see. It’s in the four or five calls you make early. Here’s what we walk through with homeowners.
- Slab and floor approach: A garage slab often sits 4 to 8 inches below the house floor, and it may slope toward the old door. A self-leveling pour or a raised wood subfloor fixes it. Pop the slab and pour fresh if there are cracks or moisture issues. Concrete work of this kind is priced separately, and we can handle it through our Concrete Driveways & Concrete Work in Westchester line if the apron needs rebuilding too.
- Entry door configuration: Your garage door becomes a wall with a standard door and windows, or you keep a wide opening and install a full-glass slider. Sliders cost more but make the unit feel bigger. Impact-rated glass is required under Miami-Dade HVHZ rules, so that’s not optional.
- Kitchen scale: A full kitchen with range, sink and fridge costs more than a kitchenette with a cooktop and under-counter fridge. If the unit will house family, go full. If it’s for rental, a compact galley works.
- Bathroom placement: Tucking the bathroom against the shared wall with your main house keeps plumbing short. Moving it to the far corner means trenching the slab for a new drain line. That single decision can swing the job $4,000 to $8,000.
- Cooling: A dedicated mini-split is the usual pick – independent control, no ductwork, quiet. Tying into your main house system only works if it has capacity to spare, and most Westchester homes don’t.
What a Garage Conversion ADU Costs in Westchester, FL

Our garage conversion work in Westchester runs $45,000 to $130,000, with most single-bay conversions landing in the middle of that band. Price moves on five real variables:
- Garage size: A single-car garage under 300 square feet keeps things lean. A two-car garage at 400+ square feet needs more of everything – flooring, drywall, HVAC, cabinetry.
- Plumbing and electrical distance: Keeping the new bath and kitchen close to existing lines saves thousands. Cutting new drains through the slab and running new service from a crowded panel pushes cost up.
- Structural changes: Removing a load-bearing wall, adding a beam, or reinforcing the roof-to-wall connection for HVHZ compliance adds cost. Most Westchester garages need some of this.
- Finish level: Builder-grade tile and stock cabinets sit at the low end. Custom cabinetry, stone counters, and specialty flooring sit at the high end.
- Permit and inspection scope: A conversion that touches plumbing, electrical and structural triggers several inspections. The county fee and the engineering review that comes with a full ADU permit are part of the number.
A written line-item estimate from us covers demo, framing, rough-in, insulation, drywall, finishes, the impact-rated door and windows, permit fees, and inspection scheduling. What it usually won’t cover is new driveway work if the apron needs replacement, or furniture and appliances you buy separately.
See the difference
Before
After
Before
After
Before
AfterWhat Westchester Homes Specifically Do to This Job
Westchester is unincorporated Miami-Dade, so there’s no city building department to walk into. Every permit, every inspection, every code question runs through the county, often online through e-permitting. That changes the job: plans have to be right the first time because resubmittals cost weeks, and inspectors work from the county list, not a municipal one. Any contractor who tells you they’ll “pull the city permit” here is telling you they haven’t done conversions in this part of Miami-Dade.
The housing stock matters just as much. The 1960s to 1980s concrete-block ranch homes on interior streets off Bird Road and Coral Way make ideal candidates – solid shells, generous garages, plenty of yard. But many of them still have lath-and-plaster on the interior walls, which has to come down and be replaced with gypsum drywall to meet the new unit’s requirements. Flat and low-slope roofs are the default here, and heavy summer rain plus wind-driven rain means we detail the flashing and drainage carefully at the new entry wall. HVHZ rules apply too: impact windows and doors, roof-to-wall connections, and product approval documentation on every glazed opening.
Serving Westchester, FL – Our Local Coverage Area
We serve Westchester and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Westchester

Plan on 3 to 5 months from permit submission to final inspection, with about 4 weeks of that in the county review queue. Construction itself runs 8 to 12 weeks depending on the scope. Call (833) 630-4214 for an exact timeline once we’ve seen your garage.
Yes. A conversion that adds a kitchen, bathroom and sleeping area is a permitted change of use, and in unincorporated Miami-Dade it goes through county e-permitting and county inspections. We handle the permit application and inspection scheduling as part of the job.
Usually, yes, if the layout is planned around existing lines. Keeping the new bathroom against the shared wall with the main house and tucking the kitchen nearby can save $4,000 to $8,000. If the garage sits far from the main water and drain stack, some slab work may be unavoidable.
Most conversions in Westchester land between $45,000 and $130,000, with finish level and plumbing placement driving most of the difference. Call (833) 630-4214 for a free on-site estimate – estimates are free and the quote is itemized.
Every conversion we build is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That covers workmanship for 24 months past completion, one of the longest workmanship guarantees in the residential construction space.
Let’s Walk Your Garage
A free on-site estimate is the fastest way to know what your garage conversion ADU will actually cost in Westchester. We’ll measure the slab, check your panel and plumbing, talk through layout, and hand you a written line-item number with no surprises. If the wider scope of your project grows into a full addition, that’s a conversation for our Home Additions & ADU in Westchester page and our Home Additions & ADU service. We also cover nearby communities like Olympia Heights and Coral Terrace. Homeowners often pair this with driveway work through our Asphalt Driveways & Resurfacing in Westchester line, using Unilock or Techo-Bloc pavers for a cleaner entrance. Call (833) 630-4214 – a live person answers 24/7.