







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterNew Detached ADU in Westchester, FL
A new detached ADU in Westchester typically runs $180,000 to $320,000 for a fully finished, permitted structure, and the timeline from design to final inspection usually lands between 7 and 12 months. A detached ADU is a separate, self-contained home on your lot – its own foundation, roof, kitchen, bath, and utility connections – which makes it the most flexible way to add living space, rental income, or room for family without touching the main house. We build these as standalone structures for homeowners in Westchester who want the extra square footage to work as hard as the rest of their property.
Groundwork Construction Co. of Westchester handles a new detached ADU from foundation to finish line: design consultation, permitting, site work, framing, trades, and the final walkthrough. It’s the same full-scope approach we bring to every Home Additions & ADU project, and it’s backed by our 730-Day Done Right Promise – if it isn’t done right, we make it right. If you’re weighing a detached ADU against an attached addition or a garage conversion, start with a free project estimate and design consult. Call (833) 630-4214 and a live person answers, day or night.
Key Takeaways
- A new detached ADU in Westchester generally costs $180,000 to $320,000 depending on size, finishes, and site conditions.
- Detached ADUs need their own foundation, utilities, and roof – they are separate structures, not room additions.
- Miami-Dade County permitting for an ADU runs 3 to 6 months and includes zoning, setbacks, and utility review.
- Our technicians have up to 12 years of experience, and every project carries the 730-Day Done Right Promise.
- Upfront pricing means the number you see is the number you pay – no change-order surprises at the end.

When You Need New Detached ADU
Homeowners in Westchester come to us for a detached ADU for a handful of concrete reasons. Here’s what that looks like in this part of Miami-Dade.
- You want rental income without sharing walls. A detached unit lets you rent to a tenant – or list it short-term – with real separation from the main house. In a market where single-family lots near Coral Gables and South Miami command premium rents, a well-built ADU can pay for itself over time.
- You’re making room for aging parents or adult kids. A detached ADU gives family their own entrance, kitchen, and bathroom while keeping them close. In Westchester, where lots tend to run generous by city standards, there’s often room to site it without crowding the main house.
- You need a home office or studio that isn’t the dining table. Post-2020, a lot of our Westchester clients want a dedicated work structure – quiet, separate, and wired for real connectivity.
- Your lot already has the infrastructure to support it. Properties in neighborhoods like Westchester Heights and the pockets off Coral Way often have utility access that makes a detached ADU more buildable than owners expect. We assess this during the design consult.
- You’ve outgrown the house but don’t want to move. Between South Florida’s property values and the cost of buying a larger home, building on your existing lot is often the smarter financial move – and it keeps you where you already are.
- You want a structure that holds value. A permitted, code-compliant ADU adds usable square footage to your property. An unpermitted one creates problems at resale. We build the former.
Our New Detached ADU Process
Here’s how we take a new detached ADU from first conversation to finished structure. Every step is on the schedule and in writing.
- Design consult and site assessment. We walk your lot, check setbacks, access, utility locations, and drainage. During this visit we talk through size, layout, and budget so you’re working from real numbers, not guesses. This consult is free.
- Design, engineering, and permitting. We coordinate drawings, structural engineering, and the Miami-Dade County permit submittal. Detached ADUs require zoning review for setbacks, height, and lot coverage, plus utility and inspection approvals. We manage the paperwork and keep you informed at each milestone.
- Site prep and foundation. South Florida’s high water table and sandy soils mean foundations need proper engineering – usually a stem-wall or slab design matched to your lot. We handle grading, drainage, and the concrete work before framing begins.
- Framing, roof, and envelope. We build the structure, install the roof, and seal it against wind-driven rain. For roofing and exterior products we use verified brand partners like GAF and James Hardie, so the ADU’s shell is rated for the same conditions as your main house.
- MEP rough-in and finishes. Electrical, plumbing, and HVAC go in, followed by insulation, drywall, cabinetry, flooring, and fixtures. Material selections run through the same curated partner list we use across all our work.
- Final inspection and walkthrough. We schedule and pass the required inspections, then do a full walkthrough with you. Every item on the punch list gets resolved before we call the job done – and the 730-Day Done Right Promise stays in effect for two full years after.
Throughout the build, our technicians arrive background-checked and in uniform. Calls go to a live person 24/7, so if something comes up on a Saturday, you reach someone who can help.

New Detached ADU Pricing in Westchester
A new detached ADU in Westchester generally falls between $180,000 and $320,000, with the wide range driven by size, finish level, and site work. Here’s how the numbers break down so you can plan.
| Line item | Typical range |
|---|---|
| Design, engineering, and permitting | $8,000 – $18,000 |
| Site prep, grading, and foundation | $25,000 – $55,000 |
| Framing, roof, and exterior envelope | $45,000 – $85,000 |
| Electrical, plumbing, and HVAC | $20,000 – $40,000 |
| Interior finishes (kitchen, bath, flooring) | $40,000 – $80,000 |
| Driveway, walkway, and hardscape | $8,000 – $25,000 |
| Contingency (recommended) | 5% – 10% of total |
What drives the cost up or down:
- Size. A 500-square-foot studio runs toward the low end; a 900-square-foot one-bedroom with full kitchen and laundry lands higher.
- Finish level. Standard finishes versus custom cabinetry, premium countertops, and designer fixtures can swing the interior number by $30,000 or more.
- Site conditions. Lots that need significant grading, retaining walls, or extended utility runs cost more. In parts of Westchester with older homes, we sometimes find utility lines that need relocation.
- Hardscape and access. Adding a paver driveway or walkway to the ADU is often worth it for rental appeal. We use brand partners like Tremron and Cambridge Pavers for these surfaces.
- Permit fees. Miami-Dade County impact fees and permit costs vary by square footage and are separate from construction.
Every project comes with no-hassle upfront pricing: the number you see is the number you pay, with change orders only when you request a scope change. Projects over $10,000 get $1,000 off, and we offer 0% financing for 18 months to spread out the cost.
For an exact number on your lot, request a free project estimate. Call (833) 630-4214 – a live person picks up 24/7.
FAQs – New Detached ADU
How much does a new detached ADU cost in Westchester, FL?
A new detached ADU in Westchester typically costs $180,000 to $320,000, depending on size, finish level, and site work. Design and permitting usually run $8,000 to $18,000 of that total, and foundation work is the wildcard – older Westchester lots sometimes need utility relocation or extra grading. Call (833) 630-4214 for an exact quote on your property; the estimate is free.
Do I need a permit for a detached ADU in Westchester?
Yes. Miami-Dade County requires a permit for any new detached ADU, and the process includes zoning review for setbacks, lot coverage, and height, plus separate electrical, plumbing, and structural inspections. Most ADU permits take 3 to 6 months from submittal to approval in this part of the county. We handle the submittal and track it through to final inspection.
How long does it take to build a detached ADU?
Plan on 7 to 12 months from design start to final inspection for a detached ADU in Westchester. Permitting alone can take a few months, and construction typically runs 4 to 7 months after that, depending on size and weather. Hurricane season can affect the schedule if we’re framing during the summer, and we build those delays into the timeline upfront rather than discovering them later.
Can a detached ADU be used as a rental in Westchester?
Yes, a permitted detached ADU can generate rental income, though local rules on short-term rentals and occupancy vary and are worth confirming with Miami-Dade County before you list. What we handle is the build: a code-compliant, permitted structure with its own kitchen, bath, and entrance. That’s what makes the unit rentable and financeable.
Is a detached ADU a good investment in Westchester?
For many Westchester homeowners, yes. A detached ADU adds permitted square footage to your lot without a separate property purchase, and rental income can offset the build cost over time. The key is building it right the first time – permitted, inspected, and finished to match the main house. Call (833) 630-4214 for a free design consult and we’ll tell you what your lot can realistically support.
If you’re considering a new detached ADU in Westchester, the first step is a conversation. We’ll walk your lot, talk through size and budget, and give you real numbers – not a range that balloons later. Projects come with upfront pricing, the 730-Day Done Right Promise, and financing that makes the build manageable. Call (833) 630-4214 today for a free estimate. A live person answers, 24/7.
Written by the team at Groundwork Construction Co. of Westchester, serving Westchester.


