Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Sunset, FL: What It Costs and How Long It Takes
A garage conversion ADU in Sunset runs $45,000 – $130,000 for most single-bay and two-bay garages, and the work usually takes 8 – 14 weeks from permit approval to final inspection. The wide dollar swing comes down to one thing: how far the existing slab, plumbing and electrical have to stretch to meet county code. Call (833) 630-4214 for a free on-site estimate and a written line-item quote.
How we run a garage conversion ADU from the first cut to the county sign-off
Every conversion we take on moves in the same order. The sequence is what keeps the schedule honest and the inspection clean.
- Stage 1, site check and scope (week 1). We measure the slab, check the existing garage door header, and map where water and power already run. Your decision here is the layout: one open studio, a bedroom-and-kitchenette, or a small one-bedroom with a full bath. That choice fixes the rest of the numbers.
- Stage 2, plans and county submittal (weeks 2 – 5, sometimes longer). Drawings go to Miami-Dade County with the required product approvals for every exterior opening and roof assembly. Your call at this stage is finish grade and window type, because impact-rated units carry a Miami-Dade NOA and those approvals drive both cost and review time.
- Stage 3, demo and rough-in (weeks 1 – 3 after permit). Out comes the old door, any storage shelving, and the worn slab topping. In go the new subfloor, the plumbing tie-ins for the bath and kitchenette, and the electrical panel work for the added load. This is the stage where you decide whether the water heater is tank or tankless and whether the unit gets its own meter.
- Stage 4, framing, insulation and drywall (weeks 3 – 7). The old garage face gets framed in for a window wall or a standard entry. Insulation and drywall close it up. Inspections for framing and rough trades happen here, and they are the ones a county inspector will not pass lightly.
- Stage 5, finishes and final inspection (weeks 7 – 12). Flooring, paint, fixtures, the mini-split or ducted system, and the final walk-through with the county. You decide tile versus luxury vinyl and cabinet grade before this stage starts, not during it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between, and what each one costs you later
Most of the money and the long-term satisfaction sit in four choices. Here’s the honest trade-off on each.
- Flooring: luxury vinyl plank vs. porcelain tile. LVP is faster to lay over a level slab and warmer underfoot, but a Sunset slab that has taken fifty years of summer rain can telegraph moisture; tile holds up better against that and against the Bay humidity. Tile adds roughly $2 – $5 a square foot in material and labor.
- Cooling: ductless mini-split vs. extending the house system. A mini-split is the clean answer for a converted garage because it doesn’t overload the main unit, and it’s cheaper to install where the ceilings are low. Extending the existing ductwork only makes sense if the main system is already oversized.
- Exterior openings: impact-rated windows and doors. Under the High-Velocity Hurricane Zone rules, every exterior opening here needs a Miami-Dade product approval. There’s no way around it, and skimping on approvals means a failed inspection and a reorder.
- Kitchenette vs. full kitchen. A sink, mini-fridge and microwave run a few thousand dollars installed. A full range and vent hood add real plumbing, gas and electrical work, and push you toward the top of the range.
What a garage conversion ADU costs in Sunset, FL

Plan on $45,000 – $130,000 for the conversion itself, on top of the property’s existing garage. Here’s what moves the number:
| Cost driver | Low end | High end |
|---|---|---|
| Single-bay vs. two-bay conversion | $45,000 | $80,000 |
| Adding full bath and kitchen plumbing | +$8,000 | +$22,000 |
| Electrical panel upgrade and dedicated meter | +$3,000 | +$9,000 |
| Impact windows and door package | +$5,000 | +$15,000 |
| Full kitchen with range and hood | +$10,000 | +$25,000 |
A written estimate from us lists the demo, framing, insulation, rough trades, finishes, fixtures and the permit line by line, plus a line for what the county charges. What a bare-bones quote often leaves out: the impact product approvals, the subfloor moisture barrier, the panel work, and the final inspection corrections. Those are the items we name up front so the number you see is the number you pay. Call (833) 630-4214 and we’ll price your specific garage.
See the difference
Before
After
Before
After
Before
AfterWhat Sunset homes specifically do to a garage conversion
Sunset is an unincorporated slice of Miami-Dade west of Pinecrest and east of the Turnpike, so nearly every plan here runs through the county building department rather than a city hall. That matters for a garage conversion because county inspectors check the Miami-Dade NOA product approval on every exterior opening and every roofing component, and they catch out-of-area contractors who show up with a Florida product that doesn’t carry one. The 33173 ZIP is mostly 1960s – 1990s ranch homes on generous lots, which is good news: the garages are wide, the slabs are usually sound, and there’s room for a mini-split condenser on a side wall without crowding the yard. The harder ones are the torn-down-and-rebuilt lots, where a newer two-story addition sits next to an older detached garage that was never tied to the main structure. We see the same failure pattern, too: a garage door that’s sagged out of square from thirty summers of heat, and stucco flashing that leaked through the rainy season without anyone noticing until the slab stained. If you’re widening the driveway while the crew is on site, homeowners often pair this with Asphalt Driveways & Resurfacing in Sunset or a fresh pour, Concrete Driveways & Concrete Work in Sunset. For the wider scope, our Home Additions & ADU service and the Home Additions & ADU in Sunset page lay out the full picture. And we cover the whole Sunset area, from Olympia Heights and Glenvar Heights down through Westchester and South Miami.
Serving Sunset, FL – Our Local Coverage Area
We serve Sunset and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Garage Conversion ADU in Sunset

Most take 8 – 14 weeks of construction after county permit approval, and the permit review itself can add 4 – 8 weeks. The build stage is what we control; the county’s review queue is the variable, so we submit early and keep the corrections list short. Call (833) 630-4214 for a timeline on your garage.
Yes. Every garage conversion ADU in Sunset needs a Miami-Dade County building permit, and the plans must carry NOA product approvals for the exterior openings and roof. We pull the permit and take it through every inspection; we don’t hand you a set of drawings and a clipboard. Call us to start the submittal.
Often yes, especially if you’re building a studio with a kitchenette and a half-bath that can tie into a nearby drain line. A full bath on the far side of the garage, or a stove that needs a gas run, usually means opening the slab. We map the existing plumbing before we quote, so you know which side of that line your garage sits on.
Plan on $45,000 – $130,000 depending on size, bath and kitchen scope, the impact window package, and whether the electrical panel needs upgrading. The estimate is free and line-item, so you see where each dollar goes. Call (833) 630-4214 for an exact quote.
Every garage conversion ADU we build is backed by our 730-Day Done Right Promise: if something isn’t right, we make it right. The finished unit, its finishes and its systems are all covered under that written guarantee.
Get your free garage conversion ADU estimate in Sunset
A free on-site estimate starts with a walk-through and a measure of the slab, not a sales pitch. We’ll tell you what the garage will take, where the money goes, and the timeline from permit to final inspection. Call Groundwork Construction Co. at (833) 630-4214 and a live person answers, day or night, ready to put your estimate on the calendar.