A Groundwork company - serving Westchester, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Miami, FL

Garage Conversion ADU in Miami - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Westchester
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Miami, FL: What It Takes and What It Costs

A garage conversion ADU in Miami typically runs $53,100 to $153,400 and takes three to six months from first permit submittal to final inspection. The work turns an existing attached or detached garage into a legal, permitted living unit: new framing and insulation, a full bathroom, a kitchenette, electrical and plumbing upgrades, and a Miami-Dade NOA-approved door and window package. It’s rarely a quick flip. Call (833) 630-4214 and we’ll walk your garage and give you a written, line-item estimate before you commit to anything.

Call (833) 630-4214

How a garage conversion actually moves, stage by stage

A garage converted into a guest room and home office

We run garage conversions in a fixed sequence. Each stage has a real duration, and each one asks you to make a decision you can’t put off. Here’s what your calendar looks like.

Stage 1: Feasibility and permit submittal (2 to 5 weeks). We measure the slab, check ceiling height against the Florida Building Code minimum for habitable space, and confirm whether the existing footing and wall ties will carry the conversion. On a Miami garage, this is where we find out if the slab needs a moisture barrier or a topping pour. You decide here whether the unit is a studio or a one-bedroom, because that changes everything downstream.

Stage 2: Demolition and shell prep (1 to 2 weeks). Out goes the overhead door, the old service door, and any termite-damaged framing. We sister or replace studs, install new sill plates, and seal the slab. If your garage shares a wall with the house, we open the connection for the unit’s access door and rough that in now. This is the stage where surprises live: rotted bottom plates behind stucco in a 1960s CBS garage are common.

Stage 3: Rough-in trades and inspection (3 to 5 weeks). Framing, electrical, plumbing, and mechanical rough-ins go in, then we schedule the county inspection before anything gets closed up. You pick the bathroom fixture layout and the location of the kitchenette here, because moving a drain after the slab is cut doubles the plumbing line. This is the single most expensive decision point on the job.

Stage 4: Insulation, drywall, and finishes (4 to 6 weeks). Spray foam or batt insulation, drywall, tape and texture, then tile, flooring, cabinets, and paint. We source finishes from our partner brands so the spec sheet matches what actually shows up. Your decisions cluster here: flooring material, cabinet grade, tile, paint color, and the door and window package.

Stage 5: Final inspection and punch list (1 to 2 weeks). The county signs off, we walk the unit with you, and we fix everything on the list before we call it done. Our 730-Day Done Right Promise covers workmanship from that walkthrough forward.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll actually make on a garage conversion

Most of the budget swings come down to five or six decisions. Here’s the honest trade-off on each.

  • Overhead door opening: A walled-in, insulated 2×6 frame with impact-rated glazing over the old opening is the standard and the sturdiest. A roll-up impact door keeps a garage function on one side but limits furniture layout. A fixed impact window wall gives the best light at the highest cost.
  • Impact-rated glazing: Miami-Dade NOA-approved windows and doors are required here, not optional. Expect that line to run higher than a standard Florida window package. It’s the biggest single line that separates Miami from anywhere north of the county line.
  • Flooring: Luxury vinyl plank over a sealed slab is the most cost-effective and handles humidity well. Porcelain tile lasts longer and feels cooler underfoot. Polished concrete is the cheapest durable option and holds up in a utility or studio unit.
  • Bathroom and kitchenette level: A compact shower, a vanity, and a two-burner cooktop with a bar sink keep the plumbing footprint tight. A full tub-shower and a real range push the line up but rent for more.
  • HVAC: A ducted mini-split or a dedicated ductless system is typical for a garage unit because tying into the house system rarely works with the existing load. Ductless is simpler to permit and service.
  • Entry configuration: Interior access through the house is convenient but adds a fire-rated door and a framed opening. A separate exterior entry door is a simpler permit and better for privacy.

Brands that come up naturally on this job include Tremron and Techo-Bloc for the exterior walkway and patio that usually gets built alongside the unit.

What Garage Conversion ADU costs in Miami, FL

A framer checking new wall framing on a home addition

Plan on $53,100 to $153,400 for a permitted garage conversion ADU in Miami. The low end covers a studio layout in a sound attached garage with the bathroom and kitchenette kept tight. The high end covers a one-bedroom in a detached garage with new impact glazing throughout, a full kitchenette, structural retrofit work, and premium finishes.

Line item Typical Miami range
Demolition, framing, shell prep $6,500 – $16,000
Electrical, plumbing, mechanical rough-in $9,000 – $24,000
Impact-rated doors and windows (NOA-approved) $8,000 – $22,000
Insulation, drywall, texture $5,500 – $13,000
Bathroom build-out $8,000 – $20,000
Kitchenette, cabinets, counter $6,000 – $18,000
Flooring and finishes $4,500 – $12,000
HVAC (ductless or mini-split) $4,000 – $9,500
Permits, plans, inspections $2,500 – $7,000

Five variables push a job toward the high end: the size and structural condition of the garage, how far the plumbing has to run from the house, whether the slab needs a new moisture barrier, the grade of impact glazing and finishes, and how much of the original structure fails inspection. A 1920s CBS garage in Little Havana will land higher than a 2005 block garage in a newer subdivision.

Your written estimate itemizes every one of those lines. What typically isn’t included: upgrades you add after the permit is pulled, landscaping beyond the immediate work area, and any utility upgrade the county requires once the unit’s load is calculated. We give you the number upfront and we hold it. Call (833) 630-4214 for the estimate.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami homes specifically do to this job

Miami sits in the High Velocity Hurricane Zone, and Miami-Dade County enforces the strictest wind-borne debris and product-approval rules in the country. Every door, every window, and every glazed opening on your converted unit needs a Miami-Dade NOA approval, and the inspector will check the label. That’s a different code from the rest of Florida, and it’s why a garage conversion here costs more and takes longer than the same job in Orlando.

Then there’s the housing stock. In older neighborhoods like Little Havana and Edgewater, we routinely open up a garage and find original 1920s CBS block walls with no continuous reinforcement or tie-downs. That triggers a full wind-mitigation retrofit once the conversion is re-permitted, and it’s the single biggest cost surprise on the job. Out near Miami Springs and Coral Gables, the 1960s concrete-block garages are usually better tied but more likely to have rotting bottom plates and old cast-iron or gray plumbing that has to be re-run. Salt air eats fasteners and hardware, so we spec rust-resistant hardware throughout, and we schedule exterior work around the June-to-November storm window rather than fighting it. Our team working across Miami knows what the inspector is going to look for before the first nail goes in.

Some homeowners pair the conversion with a new Concrete Driveways & Concrete Work in Miami pour or a resurfaced Asphalt Driveways & Resurfacing in Miami to make the new entry read cleanly from the street. If your garage conversion is part of a larger scope, that work lives on our Home Additions & ADU in Miami page, and you can see the full breadth of our Home Additions & ADU service there.

Serving Miami, FL – Our Local Coverage Area

We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked about Garage Conversion ADU in Miami

A new front yard fence with a matching gate

Get a free estimate for your garage conversion

We’ll come out to your Miami property, measure the garage, check the slab and wall ties, and give you a written line-item estimate with the permit scope spelled out. No pressure, no vague number. Calls are answered by a live person around the clock, and the price we quote is the price you pay. Call (833) 630-4214 to schedule your free on-site estimate.

Written by the team at Groundwork Construction Co.

Why Miami Chooses Groundwork Construction Co. of Westchester

We set the standard for garage conversion ADU in Miami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Customers Say

Trusted by homeowners across Miami and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodel

More services in Miami

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Westchester

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Westchester team

A local vetted partner works across Westchester and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Miami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami.

(833) 630-4214

Request a Free Estimate in Miami

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch