A Groundwork company - serving Westchester, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Fountainebleau, FL

ADU Site Prep & Utilities in Fountainebleau - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Westchester
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Fountainebleau, FL: What the Groundwork Actually Entails

ADU site prep and utilities in Fountainebleau means clearing the lot, breaking through the limestone that sits just under the grass, dewatering standing water, running electric, water, sewer, and storm drainage to the structure, and passing Miami-Dade wind-code inspections before a single wall goes up. Expect four to seven weeks for this phase alone, and budget $45,000 to $130,000 when it’s wrapped into the full project. Call (833) 630-4214 and we’ll walk your lot and give you a real number.

How We Handle the Site Work, Stage by Stage

A remodeled family room with new windows and a window seat

Every ADU site prep and utilities job in Fountainebleau runs on a sequence. The order matters because a mistake at stage two can push the whole build back a month, especially when rock-breaking and dewatering are involved. Here’s what actually happens.

Stage 1: Lot survey and utility locate (Days 1 – 3). Before anything gets moved, we pull the survey, call 811 for utility marking, and have a soils test done. In 33172 that soils report usually comes back the same way: Miami Limestone within a few feet of grade. You decide here whether the ADU footprint stays where you drew it or shifts to avoid the worst rock. Moving the footprint six feet can save thousands in excavation.

Stage 2: Clearing, demo, and rock removal (Days 4 – 12). Fence comes down, sod and pavers get stripped, and the excavator goes to work on the biscayne rock. On flat Fountainebleau lots we’re often breaking rock for eight to ten days rather than the two or three a homeowner expects. This is where the water table shows up too. During the wet season (roughly May through October), we run dewatering pumps to keep the excavation dry enough for a footing inspection. You decide here whether to pour a stem-wall foundation or a monolithic slab.

Stage 3: Underground utilities rough-in (Days 13 – 25). Water, sewer, electric conduit, and a separate storm drain line get trenched in. We coordinate with Miami-Dade Water and Sewer on the tap and set the meter can. If the lot drains toward the street, the storm line gets pitched accordingly so water doesn’t pool against the finished slab. You decide the electrical panel location and whether the ADU gets a sub-panel from the main house or a dedicated service.

Stage 4: Foundation pour and inspection (Days 26 – 35). Concrete gets poured, cured, and inspected for wind uplift anchors and rebar spacing. Post-Andrew wind code means the anchor bolts and hold-downs are set to a specific pattern – the inspector checks this closely. You don’t need to be on site for the pour, but you do need to sign off on the anchor set-out drawings before we pour.

Stage 5: Backfill, grading, and clean-out (Days 36 – 45). Trenches get backfilled and compacted, the site gets graded to drain away from the structure, and the utility stubs come up where the plumber and electrician need them. You get a marked site and a clean handoff to the framing crew. This is also where we typically stage the driveway and parking area – many homeowners pair the site work with Concrete Driveways & Concrete Work in Fountainebleau so the finished ADU has a real access point.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Weigh Before Breaking Ground

Site prep and utilities look simple on paper. Most of the decisions you’ll actually make have a direct effect on cost and how the ADU performs for the next 30 years in Fountainebleau’s climate.

  • Foundation type. Stem-wall with a raised floor handles the high water table better; a slab-on-grade is cheaper and faster but relies on grading and drainage to stay dry during hurricane season. Expect stem-wall to add roughly $4,000 – $9,000 to the site portion.
  • Impact-rated utility penetrations. Any electrical or water line that enters the structure goes through a wall assembly rated for Miami-Dade wind loads. We spec impact-rated sleeves and flashing where the conduit meets the wall – cheap insurance during a Category 1 or 2 storm.
  • Electrical service configuration. A sub-panel from the main house is the least expensive route; a dedicated meter adds roughly $3,000 – $5,000 and is the better move if you plan to rent the ADU.
  • Drainage. French drains and a dry well vs. daylighted storm line to the swale. On Fountainebleau’s flat lots, French drains are the safe default, but swale discharge costs less when it’s allowed.
  • Utility trench depth and insulation. Code minimum or a deeper trench with insulation rated for the wet-season water table. Deeper is not always better here, but we always run electrical conduit in schedule 40 PVC rather than thinner wall.

What ADU Site Prep & Utilities Costs in Fountainebleau, FL

A framer checking new wall framing on a home addition

The site prep and utilities phase of an ADU in Fountainebleau typically runs $45,000 – $130,000 when it’s part of a full build. The full ADU, once everything is finished, lands in the $90,000 – $220,000 range; site work alone pulled out as a line item usually lands between $35,000 and $75,000 depending on the lot.

Line item Typical Fountainebleau range
Clearing, demo, and rock removal (biscayne) $9,000 – $22,000
Dewatering (wet-season jobs) $1,500 – $5,000
Underground water and sewer $8,000 – $20,000
Electrical trench, conduit, and service $6,000 – $15,000
Storm drainage and grading $3,500 – $9,000
Foundation (stem-wall or slab) $12,000 – $28,000
Engineered drawings and permits $4,000 – $11,000

Four things push a Fountainebleau site job toward the high end: hitting Miami Limestone sooner than expected (adds a week of rock-breaking); a water table that rises during a summer build (dewatering pumps); relocating an existing utility line or easement; and a homeowner choosing a stem-wall foundation with a dedicated electrical service. A tight lot with a driveway tear-out also adds cost – if you’re replacing the drive, we’ve had good results pairing the site work with Paver Driveways in Fountainebleau in a single mobilization.

Every written estimate we hand over is line-itemed: rock removal, dewatering, each utility run, the foundation, permits, and the inspection fees. What’s typically not included: HOA architectural review fees (Fountainebleau has several), landscaping restoration, and final utility company connection charges. Upfront pricing – the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Fountainebleau Homes Specifically Do to This Job

Fountainebleau (ZIP 33172) is dense Kendall-area suburbia built almost entirely on drained Everglades wetland. That single fact defines every site prep job here. High water tables and limestone just below grade mean that footings and utility trenches that would be a routine afternoon elsewhere require rock-breaking and dewatering – and on some lots, an engineered foundation to keep the ADU from settling into the water table over time. It’s the reason a Fountainebleau site job takes three to five weeks longer than the same ADU two hours north.

Most of the homes we walk into around here are 1970s – 1990s Mediterranean-revival single-family homes and low-rise townhome clusters, stucco over CBS block, barrel-tile roofs. When we open the soil near an existing home, tie-beam and stucco repair are common because the original masonry wasn’t designed for the anchoring pattern Miami-Dade’s post-Andrew wind code now requires. That code shapes the site work directly: the roof-to-wall connections on the ADU have to be engineered from the foundation up, and the lot-coverage and setback limits are enforced strictly. Building anywhere in Fountainebleau means the site plan has to sit inside a specific impervious-area envelope, and we design the ADU footprint – plus its driveway, patio, and utility easements – around that.

Then there’s storm season. Miami-Dade’s summer thunderstorms and hurricane wind exposure make drainage the single most important thing we build on these flat lots. If the ADU pad isn’t graded to move water away, you’ll get standing water against the wall within one wet season. We grade every site for a 2% minimum fall on the pad and always run a gravity storm line to the swale or a dry well, whichever the lot allows. That’s the kind of thing that doesn’t show up in a punch list but shows up every June.

Serving Fountainebleau, FL – Our Local Coverage Area

We serve Fountainebleau and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Site Prep & Utilities in Fountainebleau

New painted shaker cabinets with an organized deep drawer

Ready for a Real Number on Your Fountainebleau ADU Site?

Site prep and utilities are the part of an ADU build with the widest cost swing, and the part most homeowners underestimate. We walk your lot, break down the rock removal, dewatering, foundation, and utility runs in writing, and hand you a fixed price with no change orders for conditions we should have caught. Reach out to our Home Additions & ADU team, or if the wider project scope is still on the table, start with Home Additions & ADU in Fountainebleau and we’ll schedule your free on-site estimate. Call (833) 630-4214 – a live person answers, any hour, any day.

Written by the team at Groundwork Construction Co.

Why Fountainebleau Chooses Groundwork Construction Co. of Westchester

We set the standard for ADU site prep & utilities in Fountainebleau.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Fountainebleau

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Fountainebleau Customers Say

Trusted by homeowners across Fountainebleau and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fence

More services in Fountainebleau

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Westchester

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Westchester team

A local vetted partner works across Westchester and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Fountainebleau?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Fountainebleau.

(833) 630-4214

Request a Free Estimate in Fountainebleau

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch