How Long Does Windows & Doors Take? Timelines and What to Expect

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Westchester

Last updated November 18, 2026

A new front entry door with glass sidelights
A new bay window with a cushioned seat
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

How Long Does Windows & Doors Take? Timelines and What to Expect

Impact windows ordered in peak season in South Florida can carry a 10-14 week lead time. Homeowners who didn’t know that have sat on a signed contract for two months before a single tool touched their house. That’s the part nobody warns you about. The install day is the easy, fast-looking half of a window and door project. Everything before it, and a few things after it, is what actually decides whether your job wraps in three weeks or drags into three months. In this guide we’ll break down where every week goes, how lead times shift by product type and season, what permits cost you in time around Westchester, how much a crew really finishes in a day, and the stucco and paint work after installation that surprises almost everyone.

Call (833) 630-4214

Quick Answer

For a typical whole-home window replacement, plan on 4 to 10 weeks total from signed contract to finished job, with the actual installation taking one to three days for most homes. Add 2 to 6 more weeks if you’re ordering custom or impact-rated units in peak season, and add a few days after install if you’re doing full-frame replacements that need stucco patching and paint matching. In Westchester, most standard replacement projects land in the 5 to 8 week range end to end.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Table of Contents

Elapsed Time vs. Active Work: Where the Weeks Really Go

Here’s the number that reframes the whole conversation. A 10-window project might take one day of active installation and eight weeks of elapsed time from the day you sign to the day the last caulk bead is smoothed. The installation is fast and visible. The elapsed time is slow and mostly invisible. Understanding the difference is how you set realistic expectations and avoid the “why is this taking so long” frustration that hits homeowners around week three.

Here’s the rough breakdown of an 8-week project in Westchester for standard replacement windows:

  1. Week 0-1: Contract, measurements, and order placement. Final measurements get verified, the order goes to the manufacturer. This is fast on your end and slow on theirs.
  2. Week 1-2: Permit application and plan review. Depending on the municipality, this can run one to four weeks. More on that below.
  3. Week 2-6: Manufacturing lead time. Stock sizes move fast. Custom and impact-rated units do not.
  4. Week 6-7: Delivery and staging. Windows arrive, get inspected for damage, and get scheduled onto a crew calendar.
  5. Week 7: Installation day(s). One to three days for most homes.
  6. Week 7-8: Punch list, stucco touch-up, paint matching, final inspection sign-off.

The active work hours across that entire timeline might total 20 to 40 hours of crew time. The calendar time is 40 to 60 days. Both are true. When a contractor tells you “we can have this done in a week,” ask them what they mean by “done.” If they mean installed, that can be accurate for a small job. If they mean fully completed with permits closed and stucco cured, the honest answer is usually longer.

Lead Times by Product Type: Stock, Custom, Vinyl, Aluminum, Impact

Lead time is the single biggest variable in your project, and it’s driven almost entirely by what you order. Two homes on the same street, same number of windows, same crew, can finish six weeks apart because one homeowner chose stock vinyl and the other ordered custom impact-rated aluminum.

Typical lead times by category

  • Stock vinyl windows (standard sizes): 2 to 4 weeks. The fastest option. If your openings are standard and you’re not in a high-wind zone that requires impact rating, this is the quick path.
  • Custom vinyl: 4 to 6 weeks. Sizing to the opening adds time, but vinyl manufacturing is generally quicker than aluminum or wood.
  • Aluminum (including impact-rated): 6 to 10 weeks. Aluminum orders, especially impact-rated units, run longer than vinyl because fewer manufacturers produce them and specification complexity is higher.
  • Wood-clad and premium lines (Andersen, Marvin, similar): 6 to 12 weeks. Wood-clad products are built to order in most cases, and premium brands carry the longest lead times. Quality justifies it; the schedule doesn’t lie.
  • Impact-rated windows in peak season (spring through early summer): 10 to 14 weeks. This is the number that catches South Florida homeowners off guard. When demand spikes, impact-rated manufacturers get backed up, and orders placed in April can deliver in July.

In Westchester, we’ve seen impact-rated window orders stretch from a routine 7-week turnaround in January to 13 weeks in May. The units didn’t change. The queue did. If your project has a deadline (a closing date, a rental turnover, a family event), order the windows first and work backward from the delivery date.

Doors are their own category

Entry doors, patio doors, and sliding glass doors have separate production lines. A stock steel entry door can deliver in 2 to 3 weeks. A custom fiberglass entry with sidelights might run 6 to 8 weeks. Sliding glass doors with impact glazing push into the 8 to 12 week range. We unpack the door timeline separately below.

Permit Timelines in Westchester and Surrounding Municipalities

Permitting is where a lot of homeowners lose patience, and it’s where local knowledge matters most. Westchester sits within a permitting environment that varies block to block depending on which municipality you fall under and how busy the building department is when your application lands.

What to expect

  • Standard window and door replacement permit: 1 to 3 weeks for plan review in most Westchester-area municipalities. Some are faster; some stretch longer during peak construction season.
  • Full-frame replacement: Often requires additional structural review and can push the timeline to 3 to 5 weeks.
  • Impact-rated installations in wind-borne debris regions: May require product approval documentation (NOA or Miami-Dade approval) alongside the permit application. Missing documentation is the most common cause of permit delay.
  • Historic districts: If your home is in a designated historic area, add 2 to 6 weeks for architectural review. This is non-negotiable and can’t be rushed.

What accelerates or delays a permit pull

  1. A complete application the first time. Missing product approvals, incomplete site plans, or unsigned contractor forms each add a review cycle. A clean submittal can process in days; a sloppy one can bounce for weeks.
  2. The building department’s workload. Spring and summer are peak. Hurricane recovery periods slow everything down.
  3. Whether the contractor is familiar with the municipality. A contractor who knows the local reviewer’s hot buttons submits correctly the first time. We’ve seen the difference in Westchester repeatedly.
  4. Product approval documentation. For impact-rated products especially, having the NOA or equivalent approval in hand at submittal saves real time.

Don’t skip the permit to save a week. Unpermitted window replacement can complicate a future sale, void a warranty, and, for impact-rated installations, leave you out of compliance. In Westchester, inspectors do check. Get the permit, pull it clean, and pass the inspection. It’s part of the project, not an add-on.

What Actually Happens on Installation Day

Installation day is the part that looks like the whole project from the outside. A crew shows up, windows come out, windows go in, floor stays covered, and by end of day the house looks different. Here’s what a realistic install day involves, and why the crew’s pace is faster than you might expect while still being thorough.

How many windows per day

A two- or three-person crew can typically install 5 to 10 standard replacement windows per day depending on access, floor level, and window size. Second-story windows, large picture windows, and unusual openings slow the pace. Impact-rated units take slightly longer because the sealing and flashing details are more involved. A full-frame replacement, where the entire window and frame come out and a new frame goes in, is slower than a pocket or insert replacement, sometimes by half again per unit.

What the day looks like inside the home

  • Furniture and flooring protection. Crews should cover floors and move or protect furniture near the work zones. You’ll want to clear small items and wall decor the night before.
  • Air conditioning loss. If you’re replacing every window, the house will get warm during the work. That’s a planning issue, not a failure. Schedule install for a cooler stretch if you can, or plan to be out for the day.
  • Noise. Removal is loud. Expect several hours of it. If someone in the home works from home or has noise sensitivity, plan around the install day.
  • Access to the house. Crews need space to move units from the delivery truck to each opening. Clear the driveway and the path to the work area.

What has to happen before the crew leaves

  1. All windows installed, sealed around the perimeter, and operable.
  2. Old windows and debris removed and hauled off.
  3. Interior trim reattached or replaced; exterior caulked.
  4. Glass cleaned enough to inspect for scratches or defects.
  5. Minor stucco patching completed where frames were removed (more on this below).
  6. Homeowner walkthrough: each window checked, any issues noted for the punch list.

For most homes, the actual installation is one or two days. What stretches the calendar around it is everything else. If you want the timeline to stay tight, the best thing you can do is get a written schedule from the first call, and hold the contractor to it in writing. That’s the standard we set: upfront pricing, a written schedule, and the 730-Day Done Right Promise backing the work so a rushed install or a missed detail gets fixed instead of shrugged off.

Stucco Repair and Paint Matching: The Work After the Work

This is the section homeowners rarely hear about until after install day, and it’s the one that most often extends “completion” by days or even a week. When you do a full-frame replacement, the entire window and its old frame come out. That leaves the exterior stucco around the opening disturbed, and it has to be repaired to match the original.

What the repair involves

  • Stucco patching. The material around the removed frame gets filled and finished. This takes at least two working days to cure before paint, sometimes longer if the patch is deep or the weather is humid.
  • Paint matching. Matching the original exterior paint to the patched area is not always straightforward. Stucco paint fades. A patch that matched perfectly on day one can look slightly different after curing. Realistically, you’re matching to the existing wall, and it can take one or two tries to blend.
  • Color adjustment homeowners often want anyway. Patches give you a natural moment to repaint the wall or trim. If you’ve been thinking about it, plan for this now so the painter doesn’t show up mid-project.

Why it matters for the timeline

If you do a pocket or insert replacement (where the existing frame stays and only the sashes come out), you skip most of this. The interior and exterior trim stays intact, and there’s a light caulk-and-clean job rather than stucco work. If you’re doing full-frame, add 2 to 5 working days to completion for patch-and-paint. This is also where a company with a real warranty earns its keep: stucco that isn’t properly finished can let moisture in around the frame, and that’s a warranty issue, not a cosmetic one. Groundwork’s 730-Day Done Right Promise covers this kind of detail, so a stucco seam that opens up a few months later gets repaired, not argued about.

Timeline by replacement type

  • Pocket / insert replacement: Install 1-2 days, touch-up same week. No stucco wait.
  • Full-frame replacement: Install 2-3 days, stucco cure 2-3 days, paint match 1-2 days. Total project completion adds about 4-8 days.

Doors Are a Different Timeline: Entry, Patio, and Sliding

Doors share some of the window timeline, but they have their own curve. Entry doors, especially fiberglass and steel systems with sidelights and custom sizing, often have longer lead times than a straightforward window order. And the installation itself is a bigger structural moment: a door has hinges, a lock, a frame, a threshold, and often a weather-tight seal requirement that has to satisfy code.

Typical door timelines

  • Stock steel entry: 2 to 3 weeks lead, half-day install.
  • Custom fiberglass entry with sidelights: 6 to 8 weeks lead, full-day install and trim-out.
  • Patio doors (hinged or sliding, non-impact): 4 to 6 weeks lead, 1-day install.
  • Impact-rated sliding glass doors: 8 to 12 weeks lead in normal season, longer in peak. The install involves more flashing and structural fastening.

What changes on door install day

A door replacement often involves removing the existing door and frame down to the opening, which is more invasive than a window insert. Trim inside and outside comes off. If your door is in a masonry wall, you’ll have stucco or threshold detail work that mirrors the window full-frame scenario. For a typical Westchester home, a standard entry door install and trim-out is a full day plus a couple of days of touch-up and paint. Patio doors can run longer depending on whether the existing opening has to be modified.

If you’re planning a door swap alongside a broader project, whether that’s a Groundwork Construction Co. of Westchester home renovation or a Home Additions & ADU in Westchester project, sequence the door order first. Just like windows, the door’s lead time sets the pace.

How to Keep Your Project on Schedule

Most timeline overruns aren’t caused by slow crews. They’re caused by things that could have been caught in the first week. A scheduled project in Westchester stays on track when the front end is handled cleanly.

Steps that keep the timeline honest

  1. Order early in the season. If you know you need impact windows before hurricane season, order in winter. A January order of the same product that takes 13 weeks to arrive in May delivers in 7-8 weeks.
  2. Lock measurements before signing. Remeasure after the contract is signed and before the order goes in. A measurement error caught then costs days; caught after installation it costs weeks.
  3. Submit the permit application complete. Product approvals, site plan, contractor forms. One clean submittal instead of a bounced review saves 1 to 2 weeks.
  4. Choose stock sizes if schedule matters more than exact fit. Stock sizes ship faster. Custom units make the opening look right in ways that can matter. Be honest with yourself about which priority wins.
  5. Match paint ahead of time. If you’re doing full-frame replacement, get your paint color approved before install day, so the painter isn’t waiting on you.
  6. Keep install access clear. Trimming trees, clearing the driveway, and moving fragile items ahead of install day saves crew time that adds up across six or eight windows.
  7. Get the schedule in writing. A real written schedule with milestones (order date, delivery date, permit date, install date, punch list date) is the single best accountability tool. If the contractor won’t put dates in writing, that’s a warning sign.

Windows and doors that take three weeks on paper become three months when any of these steps slips. The physics of the work are simple; the coordination is the hard part. And when coordination includes a broader project scope, sequencing with adjacencies (for example, matching new exterior doors to a new Fence Installation in Westchester or driveway approach) pays off in the finish.

Common Mistakes to Avoid

  • Ordering impact windows during peak season without a buffer. Two-month leading times are normal in spring. If your project has a deadline, order six weeks earlier than you think you need to.
  • Skipping the permit to save a week. Unpermitted window replacement in Westchester can block a future sale and invalidate warranty coverage. A week of savings can cost thousands at resale.
  • Not planning the stucco cure time. Homeowners who expect the house to be “done” on install day are disappointed when the paint isn’t matched yet. Build the cure-and-paint window into the schedule from the start.
  • Assuming all replacement windows install at the same speed. Full-frame replacement takes two to three times longer than pocket replacement. The schedule depends on which one your project uses.
  • Choosing a contractor who won’t put dates in writing. Verbal timelines drift. A written schedule, a live person answering the phone around the clock, and a real workmanship guarantee (Groundwork’s 730-Day Done Right Promise) are the accountability tripod.
  • Leaving paint color to the last minute. On full-frame jobs, the paint match is a decision, not a default. Deciding it after install is a week of waiting.
  • Not clearing install access. A crew that has to work around furniture and obstacles loses a half-day per visit that could have gone into the schedule.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

When to Call a Professional

Some window situations call for a pro immediately rather than a plan. If any of these describe your house, get an assessment before you order anything:

Windows or doors that leak during heavy rain, fog between the panes on sealed units, drafts you can feel around the frame, a door that sticks or won’t latch seasonally, or visible rot at the sill or jamb. Also: any home where the existing windows are single-pane glass in a wind-borne debris zone, and any home where the frame itself is failing and the opening needs to be rebuilt. Those aren’t cosmetic swaps; they’re structural moments that a background-checked, experienced crew needs to handle correctly.

If you’re not sure, that’s also fine. Groundwork Construction Co. of Westchester offers free estimates in Westchester – call (833) 630-4214. We’ll inspect the actual openings, tell you which replacement type fits each one, and give you a written timeline with real dates, not generalities.

Frequently Asked Questions

New double-hung windows in a dining room

The Bottom Line

The install day is the fast, easy-looking part of a windows and doors project. The honest timeline is set by everything around it: manufacturing lead time, permit review, product delivery, and the post-install stucco and paint that most homeowners don’t anticipate. Plan for 4 to 10 weeks for a standard Westchester whole-home replacement, more for custom or impact-rated products in peak season. Get the schedule in writing, order early, submit the permit clean, and plan the paint match before install day. From foundation to finish line, the project stays on track when the front end is handled right. That’s how Groundwork Construction Co. of Westchester runs it: upfront pricing, a written timeline, and the 730-Day Done Right Promise backing the work. Call (833) 630-4214 for a free estimate and a real schedule with real dates.

Written by the team at Groundwork Construction Co. of Westchester.

Getting started with Groundwork in Westchester

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Westchester team

A local vetted partner works across Westchester and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Westchester? Licensed & insured · free written estimates
Call (833) 630-4214
Local Service Coverage

Request a Free Estimate in Westchester

Tell us what you need - Groundwork Construction Co. of Westchester responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch