







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Palmetto Bay, FL: What the Job Actually Involves
Replacing cabinets and countertops in Palmetto Bay typically runs $14,000 – $45,000 for a full kitchen, or $4,000 – $13,000 for cabinets alone and $2,000 – $6,500 for countertops alone. The work takes two to four weeks from demo to final caulk, and the bulk of that time is waiting on fabrication, not installation. Call (833) 630-4214 and we’ll walk your kitchen and put a real number in writing.
This page is about one job done well: tearing out old boxes and tops, building back cabinets and counters that fit your walls, your plumbing, and how you actually cook. Not the whole remodel, not the flooring, not the lighting. Just the part that carries the most weight, literally and financially.
Key Takeaways
- Cabinets and countertops in Palmetto Bay run roughly $14,000 – $45,000 for a full replacement; cabinet-only work lands at $4,000 – $13,000.
- Fabrication lead time, not installation labor, is what stretches most jobs past two weeks.
- Moving a sink or range means new plumbing and electrical, which pushes a job toward the top of the range.
- Palmetto Bay’s Village Building Department and tree ordinance affect cabinet jobs more than most homeowners expect.
- Every project carries our 730-Day Done Right Promise, in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
How We Replace Cabinets and Countertops, Step by Step
Most contractors describe this job as “demo, install, done.” It isn’t. Here’s the actual sequence, with the decisions you’ll make at each stage and roughly how long each one takes.
Stage 1: Measure and template (day 1, about 2 hours)
We measure every wall, check for out-of-square corners and out-of-level floors, and photograph the plumbing and electrical rough-in behind the old cabinets. Palmetto Bay homes from the 1970s and 80s are rarely plumb or square, so this visit is where we find the surprises before they become change orders. You’ll decide cabinet layout, door style, and whether the sink stays put.
Stage 2: Demolition and prep (days 2 – 3)
We pull the old cabinets and countertops, cap the plumbing, and disconnect the electrical. Then we repair the wall behind them: patch drywall, address any water damage around the sink, and check that the floor is flat enough for base cabinets to sit without shimming. This is the day when old leaks surface. If we find rot or a failing shutoff valve, you hear about it that afternoon with a price, not a shrug.
Stage 3: Fabrication (days 3 – 12, off-site)
This is the long wait. Cabinet boxes are built or ordered to spec, and stone countertops are cut and polished from a digital template taken after the base cabinets are set. You’ll pick your slab in person; we don’t let anyone choose a countertop from a photo. Cambria and similar engineered surfaces and natural stone both get templated here. This stage is mostly out of your hands, which is why we front-load every decision in stage 1.
Stage 4: Cabinet installation (days 12 – 14)
Base cabinets go in first, leveled and shimmed and screwed to the wall studs, then uppers, then the island if there is one. Crown molding, filler panels, and toe kicks finish the edges. You’ll approve door and drawer alignment before we move on. If you’re replacing a galley layout with something more open, this is also when any soffit comes down.
Stage 5: Countertop template, install, and backsplash (days 14 – 21)
The countertop fabricator templates the installed cabinets, cuts the stone, and returns to set it with the sink and faucet. Backsplash goes in last so the cut edges are covered. Then we caulk, clean, and walk you through it. You sign off with the doors open and the drawers out, not with a handshake at the door.
If your cabinets and countertops are one piece of a larger kitchen project, the wider scope lives on our Kitchen Remodeling in Palmetto Bay page. That page covers layout changes, flooring, lighting, and appliance coordination.
The Choices You’ll Actually Make: Cabinets, Tops, and Hardware

Here’s the honest menu. Each option below is one real buyers in Palmetto Bay weigh against another, with what it costs and how it behaves over time.
- Stock cabinets versus semi-custom. Stock boxes come in fixed sizes and cost the least, but they leave filler strips at the walls. Semi-custom lets you choose depth, height, and drawer configuration, which matters in a 1970s ranch kitchen where the walls are never true. Expect the gap to run several thousand dollars.
- Plywood versus particleboard boxes. Plywood boxes hold up better in South Florida humidity; particleboard swells if it ever gets wet. If your sink has ever leaked, plywood is the smarter buy.
- Quartz versus granite versus solid surface. Quartz (Cambria and similar) is non-porous and needs no sealing, which suits a humid climate. Granite is natural, unique, and needs periodic sealing. Solid surface is the most forgiving and the easiest to repair, but it scratches.
- Slab thickness and edge profile. A 3cm slab with a simple eased edge keeps cost down. A thicker slab or a built-up edge adds fabrication hours and dollars.
- Drawers versus doors and roll-outs. Full-extension soft-close drawers cost more per unit but make lower cabinets usable. Roll-outs inside existing doors are the cheaper compromise.
- Hardware and finish. This is the cheapest place to change the look. Pulls and knobs are a small line item with a big visual return.
We work with KraftMaid and Kohler among others, and we’ll show you where the price difference is worth paying and where it isn’t. Picking a brand because it’s in stock is how kitchens age badly.
See the difference
Before
After
Before
After
Before
AfterWhat Cabinets & Countertops Costs in Palmetto Bay, FL
Full cabinets and countertops replacement here runs $14,000 – $45,000. That lead range assumes a typical single-family kitchen in a Palmetto Bay home, standard layout, standard-size appliances.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
Five things push a job toward the high end:
- Kitchen size and cabinet count. A 12-foot galley and a 30-foot L-shape with an island are not the same job.
- Condition behind the walls. Old water damage, failing supply lines, or a floor that needs leveling adds labor before the first box goes in.
- Moving the sink, range, or refrigerator. Relocating plumbing or electrical turns a cabinet swap into a small construction project.
- Material grade. Semi-custom plywood cabinets with quartz sit at the top; stock boxes with solid surface sit at the bottom.
- Permit scope. A straight swap may need little; moving a sink or removing a wall does not.
A written estimate from us lists cabinets, tops, installation, demo and haul-away, and permit fees separately. What it won’t hide: fabrication surcharges for unusual edge profiles, plumbing or electrical moved at your request, and any structural repair found once the wall is open. The number you see is the number you pay. We pair that with 0% financing for 18 months and $1,000 off projects over $10,000.
What Palmetto Bay Homes Specifically Do to This Job

Palmetto Bay is a Village that incorporated in 2002 to slow over-development, and it enforces some of Miami-Dade’s strictest residential construction rules through its own Village Building Department rather than the county. That changes a cabinet job in ways homeowners don’t expect. If your kitchen window looks onto a protected live oak and the cabinets need a new soffit or a bump-out, the project can hinge on a certified arborist’s report and a Village variance before a permit is even filed. We plan for that review window up front instead of discovering it in week one.
The housing stock matters too. Palmetto Bay is mostly single-family, and the 1970s and 80s ranch and Mediterranean builds on large lots are the ones getting gutted right now. Many still have original cabinet boxes, cast-iron drain lines under the sink, and walls that aren’t square. The humidity is the other constant. It makes plywood boxes and non-porous counters the practical choice, and it makes mold prevention behind the sink a real step, not a line item. If your project grows into an addition, homeowners often pair this with a Garage Conversion ADU in Palmetto Bay or a New Detached ADU in Palmetto Bay so the cabinets and the new space get planned together. Our Kitchen Remodeling service covers the broader work across Palmetto Bay.
Serving Palmetto Bay, FL – Our Local Coverage Area
We serve Palmetto Bay and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Palmetto Bay
Two to four weeks, and the fabrication wait is the reason. Demo and prep take two to three days, cabinet fabrication and stone cutting take seven to twelve days, and installation takes three to five days after that. Call (833) 630-4214 for a schedule built around your kitchen.
Straight replacement in the same footprint usually doesn’t require one, but any change to plumbing, electrical, or a wall does, and Palmetto Bay processes those through its own Village Building Department. We pull what’s required and handle the inspections, so you’re never the person chasing a sign-off.
Often yes, if the existing boxes are solid and level. If the cabinets are sagging or water-damaged, though, new stone will crack or pull away from the wall. We check the boxes first and tell you straight whether they can carry new tops. Countertop-only work runs $2,000 – $6,500.
No, not for the scope we quote. The number in your written estimate is the number you pay. The only additions are changes you request or concealed damage we show you and you approve before we touch it.
Our 730-Day Done Right Promise covers workmanship for two years. If something isn’t right, we make it right. Material warranties come from the cabinet and stone manufacturers and we register those for you.
Get a Free Cabinets & Countertops Estimate in Palmetto Bay

Call (833) 630-4214 for a free on-site estimate. We’ll measure your kitchen, talk through cabinet and countertop options, and walk out with a written line-item number the same visit. Calls are answered by a live person around the clock, and every estimate is no-hassle, upfront pricing with no surprises. If you’re comparing bids, bring them. We’ll tell you what’s missing from the other quotes.
Written by the team at Groundwork Construction Co.












