A Groundwork company - serving Westchester, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Palmetto Bay, FL

Garage Conversion ADU in Palmetto Bay - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Westchester
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Palmetto Bay: What It Costs and How Long It Takes

A Garage Conversion ADU in Palmetto Bay typically runs $45,000 – $130,000, and most projects take 4 – 7 months from permit to final inspection. Somewhere in the range of 50 – 70 homeowners call us for this, or we see it across the Village: they have a two-car garage sitting full of bikes and holiday bins, and they want it to become a rentable studio or a place for a parent to live. That’s the whole job. You’re not building new square footage; you’re turning 400 – 500 existing square feet into a legal, code-compliant dwelling, and the complexity lives in the mechanical and permit work, not the framing. Call (833) 630-4214 to get a free on-site estimate before you commit to anything.

Call (833) 630-4214

The Stage-by-Stage Process, From Day 1 to Final Inspection

A remodeled family room with new windows and a window seat

A garage conversion is not a gut remodel. You already have a slab, four walls, and a roof. That actually makes the sequence tighter and the decisions fewer – but every decision you delay costs you a week at the back end, because inspections are linear and you can’t skip ahead.

Stage 1: Site survey and design (weeks 1 – 3)

Day 1 is measurement and assessment. We check the slab elevation and slope for drainage, the ceiling height (you need 7’6″ clear minimum for habitable space in most residential code applications), the existing wall construction, and the condition of the overhead door and hardware – which on a Florida coastal build is often the first thing that fails. Then comes design: where the kitchenette goes, where the bath goes, where the sleeping area sits. This is where you decide square footage split, whether you want one room or a studio, and how much plumbing you’re willing to relocate. Design drawings and the permit application go out at the end of this stage.

Stage 2: Permitting (weeks 3 – 10, variable)

Palmetto Bay runs its own building department, so this stage is not a Miami-Dade County timeline. A garage conversion permit typically touches building, electrical, plumbing, and mechanical, and if the design affects the footprint or the tree canopy, it can pull in the Village’s arborist review as well. We build the permit package, submit it, respond to plan review comments, and coordinate the inspections. You do nothing here except sign and pay the permit fees, which we itemize upfront. Expect 4 – 8 weeks, sometimes longer if plan review kicks back for revisions.

Stage 3: Demolition and rough-in (weeks 8 – 14)

Once the permit is issued, demolition is quick – usually 2 – 4 days. The old overhead door comes out, the tracks and hardware come down, and we frame the new wall. Then the trades run in sequence: electrical rough-in first (2 – 3 days), plumbing rough-in next (3 – 5 days if you’re tying into the existing main and adding a bath), then HVAC (1 – 2 days for a ducted mini-split or a small system). Rough-in inspection happens after all three are complete. You’ll decide fixture locations before plumbing rough-in and electrical outlet placement before the electrical walk. After that, no more layout changes without a change order.

Stage 4: Insulation, drywall, and finishes (weeks 14 – 22)

Insulation and drywall take about a week to hang, tape, mud, and sand. Then comes paint (3 – 4 days), flooring (2 – 3 days), cabinetry and countertops (2 – 3 days), and trim and doors (2 days). This stage is where the budget lives or dies – the spec you picked in Stage 1 dictates the material cost here. Final MEP trim-out (outlets, switches, fixtures, HVAC registers) follows finishes.

Stage 5: Final inspections and punch list (weeks 22 – 28)

The building department signs off on the final inspection after looking at the completed electrical, plumbing, and mechanical work. You get the certificate of occupancy or its equivalent, and we walk the unit with you on a punch list. Anything that fails the walk gets fixed before we close out.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Actually Choose Between

Most of the cost difference between a $45,000 conversion and a $130,000 one comes down to these decisions, and you make them early.

  • Bathroom or no bathroom. Adding a full bath means running a drain line, a vent stack, and a water supply – and if the garage slab is on grade with the main house, you may need to cut and re-pour the slab to get the drain slope right. A half-bath or a wet-bar setup is cheaper but rules out a legal ADU in most jurisdictions. Assume $4,000 – $12,000 for the plumbing work alone if there’s no existing rough-in.
  • Kitchenette: full or minimal. A full kitchenette with a range requires a dedicated circuit and ventilation. A sink, mini-fridge, and microwave can run on a 20-amp circuit and cost less. A full kitchenette adds $3,000 – $8,000 depending on cabinets and appliances.
  • HVAC: mini-split or ducted. A ducted mini-split adds $4,000 – $7,000 and gives even cooling. A single-zone wall unit is cheaper ($2,000 – $3,500) but leaves one side of the room warmer.
  • Flooring: LVP, tile, or polished concrete. Luxury vinyl plank is the workhorse – $3 – $6 per square foot installed, moisture tolerant, easy to replace. Porcelain tile ($6 – $12/sf) handles Florida humidity best. Polished concrete ($4 – $8/sf) suits an industrial look but is cold and unforgiving on the feet.
  • Door and window: impact or standard. Palmetto Bay sits in the hurricane belt, and a garage door opening that becomes a window wall needs impact-rated glass. Impact windows and doors run $8,000 – $25,000 across a typical conversion – one of the biggest line items. Standard windows cost less but need shutter provisions and may fail the wind-load requirement at final inspection.
  • Ceiling height: existing or raised. If the garage has an 8′ ceiling, you’re fine. If it has a 7′ concrete beam mid-span, raising it may mean structural work.

What Garage Conversion ADU Costs in Palmetto Bay, FL

A framer checking new wall framing on a home addition

The realistic range is $45,000 – $130,000, with the low end describing a studio with a half-bath, existing electrical service, no structural work, and modest finishes, and the high end describing a one-bedroom with a full kitchenette, a full bath, a new HVAC system, impact windows, and premium cabinetry. A detached ADU runs $90,000 – $220,000; the conversion saves you the site work, foundation, and roof, which is why the numbers diverge so sharply.

Here’s what pushes you toward the top of that range:

  • Plumbing distance. If the main drain and water supply are 30 feet away and the slab has to be cut, budget $8,000 – $15,000 for plumbing alone. If the garage was built with a utility sink and a floor drain, you’re way ahead.
  • Electrical service. A modern 200-amp panel has room for an ADU subpanel. An older 100-amp panel with a full load will need an upgrade, which adds $3,000 – $6,000 and its own permit.
  • Structural work. Most garage conversions don’t move walls, but if you want the unit to extend out into the driveway pad, expect structural changes and a larger permit scope.
  • Existing condition. A 1970s concrete-block garage with a cracked slab and corroded overhead-door hardware means more repair. A 1990s garage in good shape means fewer surprises.
  • Material grade. Cabinetry, countertops, flooring, and fixtures are your dial. You can set that number on day one or watch it drift.

A written, itemized estimate from us lists demolition, framing, electrical, plumbing, HVAC, insulation and drywall, finishes, permits and inspections, and cleanup. It typically does not include landscaping, driveway repair, or the cost of a separate arborist report if the Village requires one. That’s the point of a line-item bid: you see the difference, and the price you sign is the price you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Palmetto Bay Homes Specifically Do to This Job

Palmetto Bay is a Village that incorporated in 2002 specifically to stop over-development, and it backs that up with some of Miami-Dade’s strictest residential construction rules. The building department is Village-run, not county-run, and plan review goes through its own reviewers. Tree preservation is a real factor: the mature live-oak canopy that defines the Village means a conversion that affects a protected oak can trigger an arborist’s report and a Village variance before you pull a single permit. We’ve seen projects in the 33158 ZIP sit for an extra six weeks waiting on arborist sign-off, and we plan the schedule around it rather than pretending it won’t happen.

The housing stock here is overwhelmingly 1970s – 90s single-family ranch and Mediterranean-style homes on large lots, and many of those original garages were built with concrete-block walls and stucco. That’s good news for a conversion. The block walls are solid, and the slab is usually in decent shape. The bad news: those older builds often have original cast-iron drain lines under the slab, and if the garage shares that line, a bathroom rough-in may require a partial under-slab repair. We scope that with a camera inspection before we commit to a plumbing number.

Hurricane exposure also shapes the material list. Impact windows and doors, roof-to-wall strap upgrades where they’re missing, and post-Andrew wind provisions all matter here. And the subtropical heat, humidity, and seasonal downpours make mold prevention and waterproofing at the slab edge a defining part of the work. If you’re also refreshing the exterior, homeowners often pair this with Asphalt Driveways & Resurfacing in Palmetto Bay or Concrete Driveways & Concrete Work in Palmetto Bay to replace the parking you’re giving up.

Serving Palmetto Bay, FL – Our Local Coverage Area

We serve Palmetto Bay and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Palmetto Bay

A new clay tile roof

Get a Free Estimate for Your Garage Conversion ADU

If you’re weighing a Garage Conversion ADU in Palmetto Bay, the first step is a free on-site estimate. We walk the garage, check the slab and the existing plumbing and electrical, ask what you want the space to do, and put the numbers in writing. This is part of the wider scope covered on our Home Additions & ADU in Palmetto Bay page if your project grows beyond the garage. We also handle the full range of Home Additions & ADU work across the area, and you can read about how we cover Palmetto Bay here. Call (833) 630-4214 to schedule your free estimate.

Written by the team at Groundwork Construction Co.

Why Palmetto Bay Chooses Groundwork Construction Co. of Westchester

We set the standard for garage conversion ADU in Palmetto Bay.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Palmetto Bay

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Palmetto Bay Customers Say

Trusted by homeowners across Palmetto Bay and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gate

More services in Palmetto Bay

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Westchester

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Westchester team

A local vetted partner works across Westchester and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Palmetto Bay?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Palmetto Bay.

(833) 630-4214

Request a Free Estimate in Palmetto Bay

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch