Concrete Driveways & Concrete Work in Hialeah, FL: What It Takes and What It Costs
Concrete driveways and concrete work in Hialeah typically run $4,500 – $12,000 for a new driveway, with most single-family pours landing around $7,000 – $9,000. Plan on 3 – 5 days from demo to the day you can park on it, plus a 7-day cure before heavy loads. A full replacement with haul-off and base rebuild runs $5,000 – $14,000. Call (833) 630-4214 for a free on-site estimate with a written line-item quote.
How a Concrete Pour Actually Runs, Start to Finish

Concrete is unforgiving about sequence. Skip a step and you’ll see it in the first wet season. Here’s the order we work in, and what you decide at each point.
Stage 1: Site check and layout (half a day)
We walk the driveway with you, check setback lines, and confirm where the city right-of-way begins. In Hialeah that matters more than most places, because a lot of properties have carports and additions that crept past the original lot lines. This is also when we check your existing drainage: where does water currently go when the afternoon storms hit? You decide the driveway width and whether you want a widened apron at the street.
Stage 2: Demo and haul-off (1 – 2 days)
Old concrete comes out with a breaker and gets hauled to a transfer station. We pull out failing roots, soft soil, and any old gravel base. If your driveway has a carport slab or a Florida room slab tied into it, we separate those pours. Haul-off is where Hialeah jobs sometimes surprise people: older driveways were often poured over rubble, broken block, or shell, and that material has to come out before anything new goes down.
Stage 3: Base prep and grading (1 – 2 days)
This is the stage that determines whether your driveway cracks in year two or year twenty. We excavate to depth, compact a graded aggregate base in lifts, and set the slope so water sheds away from the house and toward the street or a swale. You decide the finish: broom, exposed aggregate, or a light salt finish. Compacted base is also where a drainage-aware site plan comes in, especially on the low blocks near the Miami Canal where the water table sits high and standing water is a real problem.
Stage 4: Formwork, steel, and inspection (1 day)
We set forms, install rebar or welded wire mesh on chairs so it sits mid-slab rather than on the dirt, and call for inspection if the permit requires one. You’ll want to be home for a quick confirmation on expansion joint placement, particularly where the driveway meets a garage slab or a walkway. Concrete with no control joints is concrete that cracks wherever it wants.
Stage 5: Pour, finish, and cure (pour day plus 7 days)
Pour day is a full day. We place, screed, float, finish, and cut control joints. Then the driveway sits: no cars for 7 days, no heavy trucks for 28. You’ll get a cure sheet in writing. Most Hialeah jobs are done in 3 – 5 working days from demo to final cleanup, weather permitting, and we don’t start a pour if rain is in the forecast that afternoon.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between on a Hialeah Concrete Job
Concrete isn’t one product. These are the choices that actually change your price and your result:
- Standard broom finish: The workhorse. Textured, slip-resistant, and the cheapest per square foot. It’s what most Hialeah driveways should be, honestly, because wet-season traction matters more here than curb appeal.
- Exposed aggregate: The top layer of cement is washed away to reveal the stone. More grip, hides tire marks and canal-country staining better than smooth concrete, costs more and takes a more careful crew to finish evenly.
- 4-inch vs. 6-inch slab: A 4-inch slab with mesh handles foot traffic and cars. A 6-inch slab with rebar handles trucks, RVs, and boat trailers. If you park a work truck or a boat in the driveway, spend the extra money on thickness and steel.
- Fiber mesh vs. rebar: Fiber mesh is cheaper and reduces surface cracking. Rebar holds the slab together under load. On a Hialeah driveway that sees heavy vehicles, rebar wins.
- Drainage additions: Channel drains, swales, or a slight crown. Necessary on low-elevation lots; optional on higher ground.
- Decorative concrete: Stamped or colored concrete is a separate page on this site. If you want pattern work, we’ll point you there.
- Paver apron or border: Some homeowners pair a concrete pour with a Driveway & Pavers border in Tremron or Oldcastle products to break up the slab visually. Worth asking about if the driveway is wide.
What Concrete Driveways & Concrete Work Costs in Hialeah, FL

Concrete driveway installation in Hialeah runs $4,500 – $12,000, and a full driveway replacement with demo and haul-off runs $5,000 – $14,000. Here’s what pushes a job toward either end:
- Square footage: A standard two-car driveway is roughly 400 – 600 sq ft. A three-car or boat-trailer setup doubles the pour and the steel.
- Existing condition: Thick old pours, buried rubble, or a slab poured over an old shell base add demo time and haul-off cost.
- Slab spec: 4-inch broom with mesh is the low end. 6-inch with rebar, exposed aggregate, or added drainage pushes toward the high end.
- Access: If a concrete truck can’t get close, we’re wheeling buggies by hand, and that’s labor.
- Permit scope: Most driveway replacements in Hialeah require a right-of-way or driveway permit, and a permit that uncovers unpermitted prior work changes the scope.
Your written estimate lists demo, haul-off, base, steel, thickness, finish, and permit fees as separate lines. It does not include landscaping repair, fence relocation, or utility relocation, all of which we quote separately if needed. The number you see is the number you pay; there are no change orders on surprises we could have caught at the site walk.
See the difference
Before
After
Before
After
Before
AfterWhat Hialeah Homes Specifically Do to a Concrete Job
Hialeah is a city of mid-century concrete-block homes from the post-WWII boom through the 1980s, and a very large share of them have been expanded over the decades: carports, Florida rooms, and casitas added to the side or rear of the lot. A lot of that work was done without permits. So when we pull a permit on a 1950s block home in Hialeah, we’re often working around a chain of informal construction that has to be understood, and sometimes brought to code, before new work can pass inspection. That’s not a sales tactic; it’s the reality of pulling permits in ZIP codes 33010, 33012, 33013, 33014, 33015, 33016, 33017, and 33018. Our technicians have up to 12 years of experience with these lots, and we build the site walk around finding that history before it becomes a problem. If your driveway ties into a converted carport or a rear addition, homeowners often pair this with ADU Site Prep & Utilities in Hialeah so the site work is coordinated. And if you’re replacing a garage door onto that new apron, that’s Door Installation in Hialeah, a separate job we also handle. Climate matters too: the subtropical sun and humidity crack stucco and wear concrete faster, and flat, flood-prone ground near the Miami Canal means drainage has to be designed in, not added later. Interested in the wider exterior project? Start with Driveway & Pavers, or see the fuller scope on our Driveway & Pavers in Hialeah page. Everything we do in Hialeah is covered by the 730-Day Done Right Promise.
Serving Hialeah, FL – Our Local Coverage Area
We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Concrete Driveways & Concrete Work in Hialeah

A standard concrete driveway in Hialeah takes 3 – 5 working days from demo to final cleanup, then 7 days of curing before you park on it. The pour itself is one day; base prep and demo are what take the time. Rain in the wet season can push the schedule, and we won’t pour if the forecast shows storms. Call (833) 630-4214 for a schedule based on your specific lot.
Yes, in most cases a driveway replacement or new approach requires a permit through the city, especially where the apron meets the right-of-way. We pull the permit, schedule the inspection, and handle the process for you. Existing unpermitted additions on the property can complicate the permit; we find out at the site walk, before the price is final. Call (833) 630-4214 and we’ll walk you through what your lot needs.
Usually yes. We plan the pour around existing utilities and keep demo tight to the footprint; stump grinding, sod replacement, and fence relocation are quoted separately and only when needed. If a utility line sits under the driveway, we call for locates before the first cut. Call (833) 630-4214 for a site walk and a written scope.
Concrete driveway installation in Hialeah runs $4,500 – $12,000, and full replacement with demo runs $5,000 – $14,000. Size, slab thickness, steel, finish, access, and permit scope are the variables. Your quote is written line by line, and there’s a $1,000 discount on projects over $10,000. Call (833) 630-4214 for an exact quote; estimates are free.
Every concrete job is covered by the 730-Day Done Right Promise: if the workmanship isn’t right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space. We also leave you the written spec for your slab (thickness, steel, joints, cure schedule) so you have it on record. Call (833) 630-4214 with any question about the guarantee.
Get a Free On-Site Estimate for Concrete Driveways & Concrete Work in Hialeah
Call (833) 630-4214 and a live person answers, day or night, to set up a free estimate at your Hialeah property. We walk the lot, check the existing pour and drainage, and hand you a written line-item quote with the permit scope spelled out. You’ll know the price before any concrete moves. 0% financing for 18 months is available, and the $1,000 discount applies to projects over $10,000.
Written by the team at Groundwork Construction Co.