New Detached ADU in Hialeah, FL: Cost, Timeline, and What a Wind-Rated Build Actually Requires
A new detached ADU in Hialeah, FL typically runs $45,000 – $130,000 for the structure, and most projects move from first survey to final inspection in 5 to 8 months. The build has to open with a wind rating that satisfies Miami-Dade product approval, not just a floor plan. Call (833) 630-4214 and we’ll walk your lot, check what’s already on the property record, and give you a free on-site estimate.
How We Build a New Detached ADU in Hialeah, Stage by Stage

Detached means detached: your new unit sits on its own footprint with its own roof, its own utility runs, and its own set of inspections. That sequence matters more here than in most cities because of what the ground usually turns out to hold.
Stage 1: Site survey and record check (week 1)
Before anyone draws anything, we pull the property record and compare it to what’s actually standing. In Hialeah this is often the most revealing day of the job. Decades of carports, Florida rooms, and casitas built without permits show up on the lot but not on the paperwork, and that chain has to be sorted before a new ADU can clear plan review. You decide the footprint location and orientation at this stage; we tell you what the survey and setback math will allow.
Stage 2: Design, engineering, and permit submittal (weeks 2 – 8)
Plans get drawn, wind-load calculations and product approvals get attached, and the package goes to the city. This is where you choose window and door ratings, roof profile, and exterior finish. Expect 4 to 6 weeks on the permit side if the existing record is clean, longer if we’re untangling unpermitted work. You’ll sign off on the final plan set here, and that’s the point where the price locks.
Stage 3: Site prep, slab, and utility trenching (weeks 9 – 12)
Clearing, grading, and drainage come first. Hialeah’s flat ground and low elevation mean water has nowhere to go on its own, so the slab gets set above grade and the site gets graded away from both buildings. We trench electrical, water, and sewer to the main house and set the foundation forms. You decide the utility routing and whether the ADU gets a separate meter, which affects both the trench and the long-term billing.
Stage 4: Concrete block, framing, roof, and rough-ins (weeks 13 – 20)
Block walls go up, the tie-beam and roof structure follow, and inspections happen in sequence: foundation, tie-beam, framing, then rough electrical, plumbing, and mechanical. Each one has to pass before the next trade can cover it. You pick interior layouts, outlet placement, and HVAC zoning during this stretch, and this is when changes get expensive, so we ask for those decisions before the block goes up.
Stage 5: Finishes, final inspection, and walkthrough (weeks 21 – 30)
Stucco, impact windows and doors, flooring, cabinets, fixtures, paint, and trim. Final building and fire inspections, then a walkthrough with you where we write down anything that isn’t right and fix it. Our technicians have up to 12 years of experience on this sequence, and every ADU carries the 730-Day Done Right Promise: if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Decisions You’ll Actually Make on a Detached ADU
Most of the variance in a detached unit comes down to a handful of choices. None of them are cosmetic afterthoughts; each one changes cost, inspection scope, or storm performance.
- Impact windows and doors vs. shutter system. Impact-rated units cost more up front, and they’re the simpler path through Miami-Dade product approval. Shutters are cheaper on day one but you’re installing them before every named storm for the life of the building.
- Roof profile. A hip roof sheds wind pressure better than a gable, and standing-seam metal holds up to the sun and salt air better than asphalt shingle. The trade-off is upfront cost against how often you’ll be back on the roof.
- Concrete block vs. wood frame. Block is the norm for Hialeah housing stock and handles wind-borne debris and humidity better. Frame goes up faster; block is what the neighborhood is built on and what appraisers expect to see.
- Separate meter vs. tied to the house. Separate metering costs more in trenching and utility fees but keeps family finances clean if the unit will be rented.
- Size and layout. A studio-plus layout keeps the footprint tight and the price near the low end. A two-bedroom with a full kitchen and laundry pushes toward the top of the range.
- Exterior finish. Stucco matches the block homes around it and handles the climate well. Hardie siding is an option where a lighter look is wanted, though it asks more of the trim detailing in this humidity.
What a New Detached ADU Costs in Hialeah, FL

Plan on $45,000 – $130,000 for a detached ADU in Hialeah. The number you land on depends on five things, and we price all five in writing before work starts. Upfront pricing means the number you see is the number you pay, with no change orders unless you change the scope yourself.
| Line item | Typical range |
|---|---|
| Design, engineering, and permit package | $4,000 – $12,000 |
| Site prep, grading, and slab | $8,000 – $20,000 |
| Block structure, tie-beam, and roof | $18,000 – $48,000 |
| Impact windows, doors, and exterior | $8,000 – $25,000 |
| Electrical, plumbing, and HVAC rough-in plus fixtures | $7,000 – $25,000 |
What moves a job to the high end: a larger footprint, a lot that needs drainage work, separate metering, full kitchen and laundry, and any unpermitted structure that has to be addressed before inspection. What keeps it low: a compact studio layout, an easy trench to the main house, and clean records. The estimate includes the permit package and the site work. It usually does not include interior furniture, landscaping beyond final grade, or legal work to resolve title issues on an old unpermitted addition, and we’ll flag those the moment we find them.
If the detached unit is part of a full Home Additions & ADU in Hialeah plan that also touches the main house, we scope both in a single estimate so nothing overlaps in cost.
See the difference
Before
After
Before
After
Before
AfterWhat Hialeah Lots and Records Do to a Detached ADU
Hialeah’s housing stock is mostly mid-century concrete block and stucco, single-family, duplex, and small multifamily, built from the post-WWII boom through the 1980s. Many of those lots already carry unpermitted carports, Florida rooms, and casitas, so a new ADU often starts with a records review that turns up more than the homeowner expected. Pulling permits on a 1950s block home regularly reveals a chain of informal construction that has to be brought to code before new work can pass inspection. That’s the reality of building here, and it’s better found in week one than at final.
The climate sets the rest. South Florida’s hurricane code is the framework for every structural decision on a detached unit, and the flat, low-lying ground near the Miami Canal means drainage and slab elevation get designed, not assumed. Sun and humidity wear on stucco and roof surfaces faster than most homeowners expect. We work this way across Hialeah, from the blocks near Hialeah Park to the lots off West 49th Street, and we’ve seen how often a simple slab pour turns into a grading conversation.
Serving Hialeah, FL – Our Local Coverage Area
We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: New Detached ADU in Hialeah

Plan on 5 to 8 months from first survey to final inspection, with the permit phase often the longest single stretch. A clean property record speeds up the front end considerably. Call (833) 630-4214 for a schedule based on your lot.
Yes. A detached unit requires building, electrical, plumbing, and mechanical permits, and it has to meet Miami-Dade wind-load and product-approval requirements, so there is no permit-free path. We handle the submittal and the inspections. Call us and we’ll tell you what your property record will require.
Often yes. A detached unit has its own footprint, so the main house usually stays untouched beyond the utility tie-in and possibly a new meter. The tie-in point is where the cost can shift. Call (833) 630-4214 and we’ll trace the run before you commit.
The range is $45,000 – $130,000, depending on size, site conditions, utility routing, and finish level. We give a line-item written estimate before any work starts. Call (833) 630-4214 for an exact quote; estimates are free.
Every ADU we build is covered by the 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space, and it’s in writing. Call for the details in plain language.
Get a Free On-Site Estimate for Your Detached ADU
We’ll come out, look at the lot, check the property record against what’s actually standing, and talk through footprint, utility routing, and wind rating. You’ll leave with a written line-item estimate and a realistic schedule. Calls are answered by a live person, day or night. If the project grows into more than a single unit, our Home Additions & ADU team can scope the wider work, and homeowners often pair the finished ADU with Concrete Driveways & Concrete Work in Hialeah or Paver Driveways in Hialeah so the new unit has its own access and parking. Call (833) 630-4214 to book your free estimate.