A Groundwork company - serving Westchester, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · South Miami, FL

Garage Conversion ADU in South Miami - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Westchester
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in South Miami: What the Job Actually Involves

Turning a South Miami garage into a legal, livable ADU typically runs $53,100 – $153,400 and takes 10 to 16 weeks from permit submission to final inspection. The work includes framing and insulation upgrades, a new slab or floating floor, electrical and plumbing rough-in, HVAC, and finishing a kitchenette and bath to Miami-Dade’s High-Velocity Hurricane Zone standards. Most garages in 33143 convert cleanly once you clear lot-coverage limits. Call (833) 630-4214 to schedule a free on-site estimate.

Call (833) 630-4214

How a Garage Conversion ADU Comes Together Here, Stage By Stage

A garage converted into a guest room and home office

The reason garage conversions go sideways in South Miami is that homeowners treat it like a finish job. It isn’t. You’re converting a storage shell into conditioned living space, and every stage depends on the one before it passing inspection. Here’s the real sequence we run.

Stage 1: Site and structural assessment (Day 1-3)

We open the garage, check the slab for settlement and moisture, trace the existing electrical panel capacity, and measure ceiling height and door openings. You decide at this stage whether the conversion keeps the existing slab or takes a new pour, and whether you want a full bath or a half bath. That decision alone swings the budget by $8,000 – $15,000. We also pull the property’s lot-coverage and impervious-surface records, because South Miami’s small 1940s plats are tight and adding conditioned square footage can trip those limits.

Stage 2: Permits and product approval (Weeks 1-4)

Garage conversions in South Miami require a building permit through Miami-Dade County, and because we’re inside the High-Velocity Hurricane Zone, every opening, window, exterior door, and attachment gets checked against HVHZ product approval at inspection. This is the stage that stalls most DIY or low-bid jobs: a generic “impact-rated” label isn’t enough. You decide the window and door package now. We file, then wait on plan review while ordering long-lead materials.

Stage 3: Demolition and rough-in (Weeks 4-8)

The garage door comes out and gets framed for an exterior wall or French doors. We demo the interior, run new plumbing for the bath and kitchenette, upgrade the electrical panel if needed, and rough in HVAC. This is the messiest stretch, and it’s where you sign off on fixture placement before drywall closes over the walls. Budget two to three weeks for rough-in depending on how far the garage sits from the main water and sewer lines.

Stage 4: Insulation, drywall, and finishes (Weeks 8-13)

Florida’s humidity is the enemy of a converted garage. We install closed-cell spray foam or rigid board to hit the insulation values the code requires, then hang and finish drywall, set tile, and install the kitchenette and bath fixtures. You pick flooring, tile, and cabinet finishes here, and this is where the timeline stretches if selections aren’t locked early.

Stage 5: Final inspections and walkthrough (Weeks 13-16)

We schedule the county inspections – building, electrical, plumbing, mechanical – and correct anything the inspector flags before the final sign-off. Then we walk the finished ADU with you, punch-list in hand, and hand over the certificate of occupancy. The 730-Day Done Right Promise covers the workmanship from that day forward.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between for a South Miami Garage Conversion ADU

Nearly every decision in this job falls into a handful of trade-off buckets. Here’s what actually gets picked, and what each choice costs you in money or longevity.

  • Slab vs. raised floor. A sealed, level existing slab is the cheapest path and works fine if it’s dry. Raised subfloor with a moisture barrier adds comfort and protects against the summer rain that soaks South Miami garages, but it costs more and eats ceiling height.
  • Impact windows and doors vs. standard with shutters. HVHZ rules push most South Miami conversions toward impact glazing on every opening. It’s the simpler permit story and adds resale value. Shutters are cheaper up front but add a step to every storm.
  • Full bath vs. half bath. A full bath requires running a drain line to the main sewer, which can mean breaking the slab. A half bath avoids most of that trenching. The full bath is what makes the ADU rentable or family-ready.
  • Kitchenette vs. full kitchen. A compact sink, cooktop, and fridge keeps the space flexible without the cost of a full appliance package. A full kitchen raises the rental ceiling but adds circuits and plumbing.
  • Mini-split vs. ducted HVAC. A ductless mini-split is the practical choice for a single-room ADU – no ductwork, easier install, and it handles Florida humidity well. Ducted systems suit larger conversions or multiple rooms.
  • Finish grade. Builder-grade LVP and stock cabinets keep the budget at the low end. Mid-grade tile and semi-custom cabinets land in the middle. This is where you control the final number most directly.

What a Garage Conversion ADU Costs in South Miami, FL

A framer checking new wall framing on a home addition

Garage conversion ADU work in South Miami lands between $53,100 and $153,400 for a full, permitted, move-in-ready space. Where you land depends on five variables:

  • Size and scope. A one-car garage conversion runs the low end; a two-car with a full bath and kitchenette pushes toward the top.
  • Existing condition. A dry slab and adequate panel save money. Slab repair, moisture remediation, or a full electrical service upgrade add to the total.
  • Plumbing and electrical relocation. Distance from the garage to the main sewer line and panel is the single biggest hidden cost. Trenching the slab for a full bath is where budgets climb.
  • Material grade. Flooring, cabinets, tile, and fixtures can swing the total by tens of thousands depending on how far up you go.
  • Permit scope. HVHZ product approval on every opening and any lot-coverage or variance work adds review time and cost.

Your written line-item estimate covers permits, framing, insulation, drywall, electrical, plumbing rough-in, HVAC, and standard finishes. It typically excludes furniture, appliances you source yourself, and any variance fees the city requires. The number you see is the number you pay, backed in writing.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What South Miami Homes Specifically Do to This Job

South Miami is not a quiet suburb – it’s a rebuilding market. Along US-1 and around the South Miami Metrorail and Downtown Dadeland corridor, 1940s and 50s masonry and CBS homes on tight 33143 lots are being gutted or torn down for two- and three-story infill. That matters for a garage conversion in a very specific way: the garage is often the easiest path to extra square footage precisely because it doesn’t add lot coverage, but the same small plats make impervious-surface limits a real check during permitting. Add Miami-Dade’s HVHZ enforcement at inspection, and every opening in your converted ADU needs real product approval, not a generic impact label. The older garages here also tend to have original flat or low-pitched roofs and terrazzo-adjacent slabs, so moisture and slab condition get checked before anything else. This is the same reasoning that drives our approach to the wider Home Additions & ADU in South Miami work.

Serving South Miami, FL – Our Local Coverage Area

We serve South Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in South Miami

A new concrete driveway with a paver border

Get a Free Garage Conversion ADU Estimate in South Miami

Ready to see what your garage can become? Call (833) 630-4214 and talk to a live person any hour, any day – no voicemail. We’ll set up a free on-site estimate, assess your slab, panel, and lot coverage, and hand you a written line-item quote with upfront pricing so you know exactly what your garage conversion ADU in South Miami will cost before anyone swings a hammer. Homeowners in this part of South Miami often pair a garage conversion with our Home Additions & ADU work, and once the driveway is torn up for trenching, our Concrete Driveways & Concrete Work in South Miami and Asphalt Driveways & Resurfacing in South Miami crews can restore it in the same project.

Written by the team at Groundwork Construction Co.

Why South Miami Chooses Groundwork Construction Co. of Westchester

We set the standard for garage conversion ADU in South Miami.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in South Miami

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What South Miami Customers Say

Trusted by homeowners across South Miami and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new bay window with a cushioned seatA new wood side gate with black hardwareA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sink

More services in South Miami

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Westchester

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Westchester team

A local vetted partner works across Westchester and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in South Miami?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in South Miami.

(833) 630-4214

Request a Free Estimate in South Miami

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch