Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in South Miami, FL: What the Job Actually Costs
Cabinets & countertops in South Miami run roughly $16,520 to $53,100 as part of a kitchen scope, with cabinet installation alone at $4,720 – $15,340 and countertop installation at $2,360 – $7,670. A straight cabinet swap with no layout change is a 1 – 2 week job; adding countertops, a sink move, and new stone pushes it to 3 – 5 weeks. Call (833) 630-4214 for a free on-site estimate with a written line-item quote.
How we sequence a cabinet and countertop job in South Miami

Cabinet and countertop work is a chain of dependencies, and getting the order wrong is how kitchens sit half-finished for a month. Here’s the sequence we run, with the real durations and the decision points that land on you.
Stage 1: Template and field measure (day 1, about 2 hours). Before anything gets demolished, we measure the existing run, check whether the walls are square, and photograph the plumbing and electrical rough-in behind the old cabinets. In South Miami’s 1940s – 60s CBS homes, walls are rarely plumb and floors are rarely level, so this visit determines whether we’re shimming cabinets or building a new subfloor. You decide: keep the existing footprint, or commit to a layout change here. Layout changes are what trigger the trades below.
Stage 2: Demolition and rough-in (days 2 – 4). Old cabinets, countertops, and backsplash come out. If the layout is staying put, this is a one-day tear-out. If you’re relocating the sink, adding a dishwasher, or moving the range, an electrician and plumber rough in the new locations now, and the job pauses for inspection if the scope requires it. This is the stage that decides whether you’re looking at a two-week job or a five-week one.
Stage 3: Cabinet set and block (days 5 – 8). Base and wall cabinets get set, leveled, shimmed, and screwed into studs. Crown, filler, and toe kick go on. Doors and drawers go back in. You’ll want to be available around day 6 or 7 to confirm hardware placement and door swing direction before we drill.
Stage 4: Countertop template and fabrication (days 9 – 16). This is the biggest scheduling variable. Stone countertops can’t be cut from a square-foot estimate; they get templated after cabinets are set, then fabricated. Quartz and granite typically run 7 – 10 business days from template to install in the South Miami market. Laminate or butcher block can be ready in 2 – 3 days. Some fabricators will do digital templating on day 8 and install by day 15.
Stage 5: Countertop install, sink set, and final (days 17 – 21). Countertops go down, the sink and faucet get set, the dishwasher gets tied in, and we do a final walkthrough with you. Punch items get written down and closed out. Cabinets and countertops are then covered under the 730-Day Done Right Promise, our workmanship guarantee.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
Most of the money in this job sits in three decisions: cabinet construction, countertop material, and whether the layout moves. Here’s the honest breakdown of each.
- Stock vs. semi-custom cabinets. Stock cabinets come in fixed widths and depths and ship in days; they’ll leave gaps at the wall you’ll need to cover with filler. Semi-custom runs 4 – 6 weeks lead time and lets you size to the inch, which matters in South Miami’s older homes where a 36-inch run is really 35 1/2. KraftMaid is a solid middle path here: semi-custom sizing without custom pricing.
- Plywood vs. particleboard boxes. In South Florida’s humidity, plywood cabinet boxes hold up better over 15 – 20 years. Particleboard boxes are cheaper and perfectly fine in a dry climate, but they’ll swell if a dishwasher line leaks. Worth the upgrade if you plan to stay put.
- Quartz vs. granite vs. laminate. Quartz is the current default: non-porous, no annual sealing, consistent color, and it doesn’t care about South Miami humidity. Granite is durable and often cheaper per square foot but needs sealing every 1 – 2 years. Laminate saves real money upfront ($40 – $70 per linear foot vs. $90 – $175 for quartz) and looks good for 8 – 12 years. Cambria is a strong quartz pick if you want a specific colorway.
- Full-height backsplash vs. 4-inch splash. A 4-inch splash is included with most countertop installs. Full-height tile behind the range is the more requested upgrade and adds $945 – $2,950 depending on tile and wall square footage.
- Soft-close hardware and drawer systems. Cheap hinges fail first. Soft-close undermount slides and hinges add roughly $800 – $1,800 on a typical kitchen but are the difference between cabinets that feel expensive at year 10 and cabinets that don’t.
- Overlay vs. full-overlay doors. Full-overlay doors hide the cabinet frame and read more modern. Partial overlay is more forgiving on out-of-square boxes, which is common in original 1950s South Miami cabinetry.
What Cabinets & Countertops costs in South Miami, FL

Plan on $16,520 – $53,100 for the combined cabinets and countertops scope, or separately: $4,720 – $15,340 for cabinet installation and $2,360 – $7,670 for countertop installation.
| Line item | Range in South Miami |
|---|---|
| Cabinet installation | $4,720 – $15,340 |
| Countertop installation | $2,360 – $7,670 |
| Backsplash installation | $945 – $2,950 |
| Kitchen island installation | $3,540 – $11,800 |
| Combined cabinets & countertops scope | $16,520 – $53,100 |
Five things push a job from the low end to the high end:
Cabinet linear footage. An 8-foot galley run costs far less than 25 linear feet with an island. This is the single largest driver.
Whether the layout moves. A straight swap is $0 in trade work. Moving the sink means new plumbing; relocating the range means a 240V circuit; adding an island means running both. Each trade adds $500 – $2,500 and adds 2 – 4 days to the schedule.
Wall condition. In South Miami’s older CBS homes we routinely find bowing walls, missing blocking behind cabinets, and cast iron drains that need swapping once they’re exposed. Budget a 10 – 15% contingency for a 1940s – 60s home and hope you don’t use it.
Countertop material and edge profile. Laminate vs. quartz on a 30 sq ft counter is roughly a $2,500 difference. A waterfall island edge or a mitered double edge adds $400 – $1,200 in fabrication.
Permit scope. A straight cabinet and countertop swap typically doesn’t require a permit in Miami-Dade County. Any electrical or plumbing relocation does, and permit fees plus inspection days add a few hundred dollars and 3 – 5 calendar days.
What’s in a written estimate from us: cabinet install labor, countertop template and install, sink and faucet set, haul-away of old materials, and the 730-Day Done Right Promise. What’s often not included unless listed: plumbing and electrical trade work, new appliances, drywall patching, and full-height backsplash tile.
See the difference
Before
After
Before
After
Before
AfterWhat South Miami homes specifically do to this job
South Miami’s construction market is defined by continuous redevelopment along US-1. Small 1940s and 1950s single-family houses on the blocks in 33143 are regularly being torn down or gutted for new two- and three-story homes, townhomes, and mixed-use infill near the South Miami Metrorail and Downtown Dadeland corridor. What that means for a cabinet and countertop job is that we spend as much time on demolition, wall prep, and Miami-Dade code compliance as on the install itself.
The housing stock is mostly post-war CBS with original terrazzo floors, small kitchens, and low or flat ceilings. In those homes we regularly find cabinets hung off furring strips with no studs behind them, and cast-iron sink drains that start weeping the minute you pull a base cabinet. That’s an add-on you find on day 2, not something a phone quote can predict. Hurricane exposure matters too: kitchens that sit on an exterior wall get HVHZ-level product approval on impact openings during the wider renovation, which is why many homeowners pair this with a broader Kitchen Remodeling in South Miami scope so the opening work is done once.
Lot-coverage and impervious-surface limits on South Miami’s old small plats come into play whenever a kitchen expansion pushes an exterior wall. If your project is adding square footage instead of just redoing the inside, homeowners often pair this with a New Detached ADU in South Miami or a Garage Conversion ADU in South Miami so the lot is planned as one build. Any change that moves plumbing or electrical permits and inspects through Miami-Dade County.
Whether the job is cabinets and countertops only or part of a larger scope, it’s one of the improvements we run across South Miami and the blocks from Sunset Drive up through the University of Miami area.
Serving South Miami, FL – Our Local Coverage Area
We serve South Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in South Miami

Plan on 2 – 3 weeks for a same-layout cabinet and countertop swap, and 4 – 5 weeks if you relocate the sink, range, or dishwasher. The countertop fabrication window (7 – 10 business days for quartz or granite) is the longest single gap. Call (833) 630-4214 and we’ll map your specific schedule before you commit.
A straight replacement of cabinets and countertops in the same footprint typically doesn’t need a permit in Miami-Dade County. Moving a sink drain, adding a circuit for a new range, or knocking out a wall does, and each permitted trade adds 3 – 5 days of inspection time. We pull every permit the job requires and see it through inspection. Call (833) 630-4214 to talk through what your scope needs.
Yes, and it’s the fastest, cleanest version of the job: $16,520 – $30,000 combined range, about 10 – 14 days. In South Miami’s older CBS homes, keeping the footprint also keeps you out of surprise discoveries like a cast-iron drain or missing wall blocking. If your existing layout works, we’ll tell you to keep it. Call (833) 630-4214 for a same-layout quote.
The combined scope runs $16,520 – $53,100. Cabinet installation alone is $4,720 – $15,340 and countertop installation is $2,360 – $7,670, with backsplash and island work priced separately. Linear footage, cabinet grade, stone choice, and whether any trades move are what push you toward either end. Call (833) 630-4214 for an exact quote – estimates are free and itemized.
Our workmanship is covered by the 730-Day Done Right Promise – if it’s not done right, we make it right for two full years after the job. Manufacturer warranties on cabinets and stone run separately and we hand you the paperwork. Related work under the Kitchen Remodeling umbrella carries the same 730-Day Promise. Call (833) 630-4214 to schedule your free estimate.
Schedule a Free On-Site Estimate
Call (833) 630-4214 to book a free on-site estimate for cabinets & countertops in South Miami. During the visit we measure the existing run, photograph the plumbing and electrical rough-in, and walk you through both a same-layout and a layout-change option. You get a written line-item quote with fixed pricing, no change-order surprises, and a realistic start date. Live person answers the phone, any hour.