A Groundwork company - serving Westchester, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Gladeview, FL

Garage Conversion ADU in Gladeview - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Westchester
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Gladeview, FL: What It Costs and What’s Involved

A garage conversion ADU in Gladeview runs $45,000 – $130,000 and takes roughly 4 to 7 months from permit to final inspection. The low end is a straightforward living space with a bath and kitchenette; the high end adds a full kitchen, upgraded finishes, a separate utility meter and impact-rated doors and windows. Most of the older block garages we convert here sit at $70,000 – $95,000. Call (833) 630-4214 and we’ll walk your space and give you a written number.

Call (833) 630-4214

How a Garage Conversion ADU Comes Together, Stage by Stage

A finished backyard cottage with a small covered porch

Gut conversion on a 1950s concrete-block garage pays off in the sequence. Skip a step and you’ll pay for it twice.

Stage 1: Assessment and permitting (weeks 1 – 6). We measure the slab, check the wall thickness, and trace what’s buried in the floor and ceiling. You’ll decide here whether to keep the existing overhead door opening and frame it into a window wall, or close it entirely. Plans go to Miami-Dade County for review; that wait is not ours to rush.

Stage 2: Demolition and shell prep (week 6 – 8). Down come the old door, tracks, opener and any partition walls. We repair the block where fasteners and moisture have chewed it up. You’re not making a decision here, just watching us find out what the floor and walls actually look like.

Stage 3: Framing, slab and rough systems (weeks 8 – 13). Interior stud walls, the bathroom subfloor, then plumbing and electrical rough-in. Drying our climate makes slabs a controlled problem and that timer starts now. Your choices land here: kitchenette or full kitchen, where the shower sits, whether you want a stackable laundry closet.

Stage 4: Insulation, drywall and systems test (weeks 13 – 18). Closed-cell insulation, drywall hung and finished, then the rough inspections that have to pass before anything gets covered. This is the phase where a separate electrical service or the existing panel becomes a real conversation. You’ll pick the water heater type and any mini-split before walls close.

Stage 5: Finishes and final walkthrough (weeks 18 – 26). Flooring, tile, cabinets, paint, trim, and the final inspection. You sign off against the same line-item quote you started with, backed by our 730-Day Done Right Promise. Door hardware, outlets and light placement get settled in the last two weeks, not the first.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Actually Choose Between

  • Kitchenette vs. full kitchen. A kitchenette (sink, mini-fridge, two-burner cooktop) keeps the budget near the low end. A full range, vent hood and dishwasher add cost and often demand a second 20-amp circuit and more plumbing. Renters love the full kitchen; family stays rarely need it.
  • Impact-rated doors and windows. In Gladeview these aren’t optional upgrades for most of the opening. Impact-rated units and a matching window in the old overhead-door bay cost more than standard, but they’re the only versions that pass hurricane-zone inspection.
  • Bathroom configuration. A walk-in shower keeps the footprint tight and slashes square footage. A tub needs more room and more materials. For a rental unit, the shower is usually the smarter spend.
  • Water heater and HVAC. A tankless electric unit frees up closet space but needs adequate service capacity. A mini-split heats and cools one zone efficiently. You’ll choose both before walls close.
  • Flooring. Porcelain tile suits South Florida humidity; luxury vinyl is warmer underfoot and easier to replace. Carpet in a converted garage is a mistake here and we’ll say so.
  • Exterior finish. Stucco patched to match the CBS walls, fresh hardie-style cladding or a painted block finish. Paver aprons on the approach are a common add-on, and if you’re redoing the approach anyway, many homeowners pair this with Concrete Driveways & Concrete Work in Gladeview.

What Garage Conversion ADU Costs in Gladeview, FL

A framer checking new wall framing on a home addition

Residential garage conversions in Gladeview land between $45,000 and $130,000, with the typical project at $70,000 – $95,000. Where you land depends on five things:

  • Garage size and slab condition. A single-car stall runs cheaper per square foot than a double. Original slabs with cracks or poor slope may need topping or replacement, which adds several thousand.
  • Plumbing and electrical runs. If the garage shares a wall with the house’s wet wall, plumbing is short. If not, trenching and re-running lines pushes the job toward the high end.
  • Structural work. Closing the door opening, adding a beam, reinforcing roof-to-wall connections on an older CBS garage. Any of these moves the number.
  • Finish grade. Builder-grade vs. custom tile, cabinetry and fixtures is a wide spread. A curated set of brands like KraftMaid and Kohler sits in the middle of that range with predictable pricing.
  • Permit scope. A habitable unit that needs its own electrical service or a new bathroom triggers more inspection stages. A studio with a kitchenette touches fewer.

Every written estimate we hand you is line-item and fixed. What’s included: demolition, framing, rough systems, insulation, drywall, finishes per your selections, permits and inspections. What isn’t always included: a separate utility meter, landscape repair, and appliances beyond the specified package. Call (833) 630-4214 for an exact quote. Estimates are free.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Gladeview Homes Specifically Do to This Job

Nearly every garage we convert in Gladeview, FL is a mid-century concrete-block structure under a run of Miami-Dade County permitting, and plenty of those block walls have aluminum-frame or jalousie openings that need impact-rated frames before the unit is legal. That’s the whole game here. The Florida Building Code’s High-Velocity Hurricane Zone requirements mean the new doors and windows are engineered for 150+ mph winds, not the lighter standards used elsewhere. On top of that, many of these pre-Andrew garages lack the roof-to-wall hurricane straps that HVHZ permitting now demands, so a “simple” conversion can pull a strapping retrofit into the job to pass inspection. We see it constantly on the CBS homes off NW 22nd Avenue and the side streets off NW 27th Avenue in ZIP 33147. The older the slab, the more we find moisture intrusion where the garage apron meets the wall, and the flat or low-slope roof that covers the garage is often the first thing failing. Subtropical rain and summer sun wear those surfaces fast, so a watertight roof is a prerequisite, not a later fix. If the conversion grows past the four walls into something larger, that’s usually where it becomes part of a full Home Additions & ADU in Gladeview scope. We cover the whole community through our Gladeview service page and handle this as one of our seven core lines under Home Additions & ADU.

Serving Gladeview, FL – Our Local Coverage Area

We serve Gladeview and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions About Garage Conversion ADU in Gladeview

A new clay tile roof

Get a Free Estimate for Your Gladeview Garage Conversion

If you’ve got a garage doing nothing but collecting heat, it’s worth a real number. Call (833) 630-4214 for a free, no-pressure on-site estimate for a Garage Conversion ADU in Gladeview, FL. You’ll get a written line-item quote, a realistic schedule, and straight answers on permits and storm-hardening. Calls are answered by a live person 24/7. And if you’re redoing the drive approach as part of the project, we handle that too – homeowners often pair this with Asphalt Driveways & Resurfacing in Gladeview.

Written by the team at Groundwork Construction Co..

Why Gladeview Chooses Groundwork Construction Co. of Westchester

We set the standard for garage conversion ADU in Gladeview.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Gladeview

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Gladeview Customers Say

Trusted by homeowners across Gladeview and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerNew double-hung windows in a dining roomA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsula

More services in Gladeview

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Westchester

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Westchester team

A local vetted partner works across Westchester and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Gladeview?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Gladeview.

(833) 630-4214

Request a Free Estimate in Gladeview

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch