New Detached ADU in Gladeview, FL: What It Takes
A new detached ADU in Gladeview, FL typically runs $45,000 – $130,000 and takes four to seven months from permit to final inspection, depending on size and how much site work the lot needs. Every structure here has to clear Miami-Dade County permitting under the Florida Building Code’s High-Velocity Hurricane Zone rules, engineered for 150+ mph winds. Call (833) 630-4214 for a free on-site estimate and a line-item number you can hold us to.
How We Build a Detached ADU, Step by Step

Most contractors hand you a schedule and hope you don’t ask questions. Here’s what actually happens, so you know where the time goes and what you’ll be deciding.
Stage 1: Site walk and feasibility (week 1)
We walk the lot, check setbacks, drainage, and existing utilities, and confirm what the county will allow. In Gladeview’s older CBS lots, we also look hard at the ground: how the existing house sits, where the sewer or septic runs, and whether the ADU pad will drain away from both buildings. You decide the footprint and rough placement.
Stage 2: Design, engineering, and permitting (weeks 2 – 10)
Plans get stamped by an engineer and submitted to Miami-Dade County. HVHZ submissions are slower than standard because the wind-load calcs, roof-to-wall connections, and product approvals all get reviewed. Plan review alone is often four to eight weeks. You approve the layout, door and window schedule, and finish level before submission.
Stage 3: Site prep and foundation (weeks 11 – 14)
Clearing, grading, and forming the slab or stem-wall foundation follow. Inspections happen before the pour – footings and underground plumbing get signed off first. You don’t decide much here, but you’ll see the pad take shape and confirm utility runs.
Stage 4: Shell, roof, and storm hardening (weeks 15 – 22)
We frame, roof, and install impact-rated systems. This is where HVHZ requirements really bite. You choose door and window type, roof covering, and exterior finish at this stage.
Stage 5: Interior finish and final inspection (weeks 23 – 28)
Rough-in inspections clear, then drywall, cabinets, flooring, and paint go in. Final building, electrical, plumbing, and mechanical inspections all have to pass before the certificate of occupancy. You walk the unit with us and we correct anything on the punch list.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
This is where the budget lives or dies. Here’s what you’re actually picking between, with honest trade-offs.
- Impact windows and doors (Andersen or Marvin): Non-negotiable under HVHZ, but the grade matters. Standard impact units cost less; high-performance lines cut heat gain and noise, which matters if the ADU sits close to the main house.
- Roof covering: Architectural shingles cost less up front; barrel tile matches Gladeview’s older homes and lasts longer under Miami sun. Both must meet HVHZ approval.
- Slab-on-grade vs. stem wall: Slab is faster and cheaper; stem wall handles uneven lots and keeps flooring above grade in heavy summer rain.
- Frame type: Block (CBS) construction matches the neighborhood and resists moisture; wood frame builds faster and costs a bit less but needs careful detailing.
- Finish level: Builder-grade cabinets and flooring keep you near the low end; KraftMaid cabinetry and upgraded flooring push toward the high end and hold up better if the ADU will be rented.
We walk you through each choice with real numbers before you commit. No surprises later.
What New Detached ADU Costs in Gladeview, FL

Expect $45,000 – $130,000 for a detached ADU in Gladeview. The number moves based on five things:
- Square footage: A 400 sq ft studio sits near the low end; a 900+ sq ft two-bedroom sits near the high end.
- Site conditions: Flat, clear lots cost less; lots needing grading, fill, or new utility runs cost more.
- Utility extensions: Running water, sewer, and electrical from the main house adds cost, especially across a long yard.
- Material grade: Standard finishes vs. premium cabinetry, tile, and windows.
- Permit scope and engineering: HVHZ wind-load engineering and county review add real cost, not hidden fees.
Our written estimate is line-item and fixed. The number you see is the number you pay. What’s included: design coordination, permits, foundation, framing, roofing, MEP rough-in and finish, standard finishes, and final inspections. What isn’t included: custom landscaping, fencing, and furniture unless you ask for them.
As part of a Home Additions & ADU in Gladeview project, we can scope the ADU alongside other work so the site costs get shared.
See the difference
Before
After
Before
After
Before
AfterWhat Gladeview Homes Specifically Do to This Job
Gladeview sits in ZIP 33147 and runs almost entirely through Miami-Dade County permitting under the HVHZ rules. That means every structural element we build is engineered for hurricane-force wind, and inspectors check connections, not just appearance. The neighborhood’s stock is mid-century CBS homes with original barrel-tile or shingle roofs and aluminum-frame or jalousie windows. We see roof-to-wall connections that were never strapped, so when we tie a new ADU into existing utilities or attach a covered walkway, we often have to bring the main house’s connections up to code. Contractors doing work here juggle storm hardening and aging masonry in the same job. If your property is older, plan for a strapping retrofit somewhere in the scope – it’s cheaper to address during the ADU build than after. Homeowners often pair this with Concrete Driveways & Concrete Work in Gladeview to tie in the new ADU pad, or with Paver Driveways in Gladeview for a finished approach run.
Serving Gladeview, FL – Our Local Coverage Area
We serve Gladeview and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – New Detached ADU in Gladeview

Four to seven months from contract to certificate of occupancy, with permitting alone taking four to ten weeks under HVHZ review. Call (833) 630-4214 for a schedule based on your lot.
Yes, always. Miami-Dade County requires full building, electrical, plumbing, and mechanical permits for any detached ADU, and HVHZ plans must be engineered. We pull and manage all permits – you never chase a signature.
Usually yes. A detached ADU connects to utilities via new underground runs rather than reworking the main house, so structural changes to your existing home are rare. Site condition and utility distance drive the cost.
Between $45,000 and $130,000 depending on size, site, utilities, and finishes. Every estimate is line-item and fixed, and the number you see is the number you pay. Call (833) 630-4214 for your free estimate.
Our 730-Day Done Right Promise covers workmanship for two full years. If something isn’t right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space.
Get Your Free On-Site ADU Estimate in Gladeview
We’ll visit your property, check setbacks and utilities, and walk you through a line-item estimate with real numbers – no ballpark, no pressure. Our technicians have up to 12 years of experience, and every project is covered by the 730-Day Done Right Promise. We serve the broader Gladeview area and work closely with our Home Additions & ADU team. Call (833) 630-4214 to schedule.