A Groundwork company - serving Westchester, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Hialeah, FL

Garage Conversion ADU in Hialeah - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Westchester
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Hialeah, FL: What It Takes and What It Costs

A garage conversion ADU in Hialeah typically runs $30,000 – $80,000 and takes most homes three to five months from first inspection to final walkthrough. That range covers the gut work (demo, framing, insulation, drywall), a new bathroom and kitchenette, electrical and plumbing, impact windows, and a separate entry. Your number depends mostly on what the inspection on the existing garage turns up. Call (833) 630-4214 to schedule a free on-site estimate and a written line-item quote.

Call (833) 630-4214

How a Garage Conversion ADU comes together, stage by stage

A remodeled family room with new windows and a window seat

Converting a garage into livable space is a sequence, not a pile of trades running at once. Here’s the order we work in, what happens at each stage, and the decisions that land on you.

Stage 1: Feasibility and the existing-condition walk (week 1)

Before anyone swings a hammer, we check the slab, the ceiling height, the party walls, and what’s really behind the drywall. In an older Hialeah block home this is where surprises show up. You decide the unit’s layout and where the separate entry goes. A structural check may be required if any wall comes out.

Stage 2: Permits and drawings (weeks 2 – 5)

We prepare the plan set and pull permits through Miami-Dade. Timelines here depend on whether prior unpermitted work surfaces during review, which happens often on mid-century homes. You choose the window package and confirm the square footage at this point, because both feed the drawings.

Stage 3: Demo and rough-in (weeks 5 – 8)

Out comes the old door, any shelving, and the ceiling where new framing is needed. We pour or level the slab, frame walls, then run rough plumbing and electrical to the new bathroom and kitchenette. Mechanical rough-in gets inspected before anything closes up. You lock in fixture locations now, not later.

Stage 4: Insulation, drywall, and systems (weeks 8 – 12)

Spray foam or batt goes in the walls and ceiling, then drywall, tape, and texture to match the main house. The mini-split or HVAC gets set, the water heater placed, and the impact windows set into their openings. You pick paint colors, flooring, and cabinet faces.

Stage 5: Finishes and final inspection (weeks 12 – 20)

Tile, flooring, trim, fixtures, the bathroom set, and the kitchenette go in. We walk the unit with you, punch out the list, then hold the final inspection. You get the signed-off permit and a written warranty.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll actually make (and what each one costs you)

Most of the budget swings in a handful of decisions. Here’s how we frame each one.

  • Slab and floor: Patching and sealing the existing slab is the budget move. A new poured floor or a raised subfloor handles damp and level problems better, and it costs more. In older block garages, a crack down the middle is common; we read whether it’s cosmetic or structural before you choose.
  • Climate control: A ductless mini-split is the practical choice for a Florida garage conversion ADU. It handles the subtropical humidity without tying into the main house. Extending the existing HVAC is possible but often undersized for the extra square footage.
  • Windows and doors: Impact-rated assemblies are the standard here and non-negotiable for a legal unit. Andersen and Pella both make products that fit the opening sizes we commonly see. Cheaper windows that meet code but no more will pass. Better ones hold up to the June-to-November sun without fogging.
  • Kitchenette grade: A bar sink, two-burner cooktop, and compact fridge keeps it simple. A full kitchen costs more and adds plumbing runs. For a family casita, simple wins. For a rental unit, tenants will expect more.
  • Bathroom: A walk-in shower with a curb is the value pick. A fully tiled zero-threshold shower is easier to use and holds up longer. Kohler fixtures are a solid mid-grade anchor.

What a Garage Conversion ADU costs in Hialeah, FL

A framer checking new wall framing on a home addition

The honest range is $30,000 – $80,000 for the conversion itself. It’s tied to the same market math as a Home Additions & ADU in Hialeah project, since a converted garage is a smaller version of the same permitting and inspection reality. That’s the number for turning an existing garage into code-compliant living space; the enclosed living area is what you’re paying for, and it costs less per square foot than a new detached build.

What pushes a job toward the low end: a garage that’s already insulated, a simple layout, a curb shower, mini-split, and no structural changes. What pushes it to $80,000 or more:

  • Unpermitted prior work that has to be legalized before your new unit can pass inspection.
  • Raised mechanicals, required because Hialeah sits at low elevation near the Miami Canal and flood-prone ground.
  • Structural changes like removing a bearing wall or adding a second bath that needs new plumbing runs.
  • Impact-rated windows and a full kitchen instead of a kitchenette.
  • Roof and stucco repairs where the Florida sun has cracked the original envelope.

A written estimate from us lists each stage as a line item, so you see the demo, the rough-in, the finishes, and the permits separately. What’s sometimes not in a preliminary number: the cost of correcting unpermitted work we don’t find until we open a wall. We flag that risk on the first walk-through rather than after demo. Our Home Additions & ADU service covers the broader scope if you’re also adding onto the main house. Upfront pricing, no surprises is the rule: the number on the quote is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why Hialeah’s housing stock changes this job

Hialeah’s construction market is built on a dense Cuban-American fabric of grandfathered concrete-block homes and add-on units, many of them built without permits. That means nearly every garage project starts with figuring out what’s already there legally. On a 1950s block home, pulling a permit for a conversion can reveal a chain of unpermitted additions – a carport turned Florida room, a back casita, a garage door that was never permitted – that has to be brought to code before your new unit can pass. We work through that chain rather than around it. The housing stock itself is overwhelmingly mid-century block and stucco construction, so we’re usually working with original 2×4 framing, slab-on-grade floors, and ceiling heights that need trimming. Add Miami-Dade’s post-Surfside scrutiny and the flat, flood-prone ground, and the requirements get sharper: mechanicals elevated, impact windows throughout, drainage considered at the slab. Homeowners often pair a conversion with a new apron out front – our Concrete Driveways & Concrete Work in Hialeah or Asphalt Driveways & Resurfacing in Hialeah teams handle that when the old garage slab and approach need replacing. We cover all of Hialeah and the surrounding neighborhoods in 33012, 33011, and 33017.

Serving Hialeah, FL – Our Local Coverage Area

We serve Hialeah and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – Garage Conversion ADU in Hialeah

A new stained cedar privacy fence

Get a free estimate for your Hialeah garage conversion

Call (833) 630-4214 and we’ll schedule a free on-site visit at your Hialeah home. We walk the garage, check the slab and the walls, and flag any unpermitted work before it becomes a surprise. You leave the visit with a written line-item estimate and a realistic timeline, not a ballpark. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off. Estimates are free and the price we quote is the price you pay.

Written by the team at Groundwork Construction Co.

Why Hialeah Chooses Groundwork Construction Co. of Westchester

We set the standard for garage conversion ADU in Hialeah.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hialeah

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hialeah Customers Say

Trusted by homeowners across Hialeah and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelights

More services in Hialeah

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Westchester

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Westchester team

A local vetted partner works across Westchester and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Hialeah?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hialeah.

(833) 630-4214

Request a Free Estimate in Hialeah

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch