







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Gladeview: What the Job Costs and How Long It Takes
New cabinets and countertops in Gladeview typically run $14,000 – $45,000 for a full kitchen’s worth, with cabinet installation alone at $4,000 – $13,000 and countertops at $2,000 – $6,500. A typical cabinet-and-countertop swap takes three to five weeks from demolition to final caulk, and most of that clock is templating and fabrication time, not labor in your kitchen. Call (833) 630-4214 and we’ll price your Gladeview kitchen against what your house actually allows.
How We Run a Cabinet and Countertop Job, Stage by Stage

This isn’t a mystery box. Here’s the sequence, who decides what, and how long each stage runs in a Gladeview home.
Stage 1: Measure and layout (day 1, about two hours)
We field-measure the room, check wall plumb and floor level, and map the cabinet runs. You decide the layout: keep the existing footprint or shift the sink, range, or fridge. Any move that relocates plumbing or a 240V line adds cost and time, so this is the decision that sets the budget. We flag it on the spot.
Stage 2: Demolition and prep (days 2 – 3)
Old cabinets, counters, and backsplash come out, and we protect the floor and the rooms next door. In Gladeview’s older CBS homes, this is where we find the surprises: out-of-square walls, a slab that’s drifted, or old wiring behind the cabinet run. If the walls need furring or a leveling shim layer, we price it before proceeding, not after.
Stage 3: Cabinet install (days 3 – 5)
We hang uppers, set bases, level the run, and install fillers and crown. You confirm door style, hardware placement, and drawer configuration before anything is drilled. Appliance openings get built to the spec sheets you’ve already picked.
Stage 4: Template and fabrication (the quiet week)
Countertop templating happens once the base cabinets are set. Stone and quartz then go to the fabricator, which takes five to ten business days depending on material and edge profile. The kitchen sits quiet during this stretch. You’ll finalize your sink, faucet, and edge detail before the template so the cutouts come out right.
Stage 5: Counter install and finish (days 12 – 16)
Slabs go in, seams get set, and the sink and faucet connect. Backsplash, caulk, and final walkthrough close it out.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
Here’s where your money and your taste collide. We’ll walk you through each one with real numbers.
- Cabinet box construction: Plywood boxes outlast particleboard in Miami-Dade humidity, which swells cheap board at the seams. The trade-off is cost, not longevity. KraftMaid is one line we work with that offers both.
- Door style and finish: Painted MDF and thermofoil are budget-friendly; solid wood and painted maple hold up better over years of daily use. Flat slab doors read modern, shaker reads classic, and neither is cheaper by much.
- Countertop material: Quartz is the go-to for stain resistance and needs no sealing; Cambria is a brand we specify often. Granite costs similar and takes heat better but needs periodic sealing. Laminate runs a fraction of stone and suits a rental or a tighter budget.
- Edge profile: A standard eased edge is included; a thick mitered edge adds a premium look at a premium price.
- Sink and faucet: Undermount sinks and a pull-down faucet are the current default. Decide before templating, or the cutouts get redone.
What Cabinets & Countertops Costs in Gladeview, FL

Expect $14,000 – $45,000 for a full kitchen of cabinets and counters. Here’s what pushes a job toward the low or high end.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash | $800 – $2,500 |
| Kitchen island | $3,000 – $10,000 |
The variables that move the number: kitchen size (linear feet of cabinet run), cabinet grade (stock vs. semi-custom vs. custom), countertop material (laminate vs. quartz vs. thick-edge stone), layout changes (relocating a sink or range means plumbing and electrical), and wall and floor condition in an older home. A written estimate lists cabinets, counters, demo, install labor, and permit fees. It typically excludes appliances, and it should spell out whether drywall repair is inside the number.
See the difference
Before
After
Before
After
Before
AfterWhat Gladeview Homes Specifically Do to This Job
Gladeview’s housing stock is mid-century concrete-block, and that changes how a cabinet job goes. Plenty of these CBS homes in the 33147 ZIP have walls that have drifted out of plumb over decades, so we shim and furr the runs rather than assume the cabinets will hang flat. The Florida Building Code’s High-Velocity Hurricane Zone rules don’t govern cabinetry the way they govern roofs and windows, but they do shape what a permit pulls in once you touch structure. If your kitchen refresh grows into moving a wall or opening the footprint, it stops being a cabinet job and becomes part of a full Kitchen Remodeling in Gladeview. Many Gladeview homeowners pair this work with a Garage Conversion ADU in Gladeview or a New Detached ADU in Gladeview when they’re adding living space, and often the cabinetry package carries over. We cover all of Gladeview, from Brownsville-adjacent blocks to the Miami Springs side.
Serving Gladeview, FL – Our Local Coverage Area
We serve Gladeview and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Gladeview

Plan on three to five weeks. Cabinet install itself runs three to five days, then stone templating and fabrication take five to ten business days, followed by counter install and finishing. Call (833) 630-4214 for an exact schedule for your kitchen.
Straight replacement of cabinets and counters usually doesn’t require a permit. Moving plumbing, gas, or electrical does, and so does any structural change to walls or load-bearing elements. Miami-Dade County permitting governs Gladeview, and we pull the permits and pass the inspections when the scope calls for it.
Yes. Keeping the sink, range, and fridge in place is the most common and most economical approach. Moving a sink or gas range adds plumbing and electrical cost and can add a week, so decide upfront.
Most full kitchens land between $14,000 and $45,000. Cabinet installation alone runs $4,000 – $13,000, countertops $2,000 – $6,500, and an island $3,000 – $10,000. Call (833) 630-4214 for a free, line-item estimate.
Every job we do is covered by our 730-Day Done Right Promise: if it isn’t done right, we make it right. Technicians are background-checked and arrive in uniform.
Get a Free Estimate on Cabinets & Countertops in Gladeview
Call (833) 630-4214 for a free on-site estimate on cabinets and countertops in Gladeview. A live person answers around the clock, and we can often offer 0% financing for 18 months or $1,000 off projects over $10,000. We’ll measure your kitchen, talk through material options, and hand you a written line-item quote with no change orders. Our kitchen remodeling service covers the full scope when your project grows.
Written by the team at Groundwork Construction Co. of Westchester.












